North America  |  Canada  |  Toronto
 7.9K   1   92 
TYSSE: Vaughan Metropolitan Centre Station
share  tweet  share 
  10 renderings
Vaughan Metropolitan Centre subway station will be the new terminus of the Spadina subway. Part of the Toronto York Spadina Subway Extension (TYSSE) project now under construction, it is expected to open in 2017.

The station is designed by the team of Arup Canada – Engineering & Architects of Record, and Grimshaw Architects – Design Architect.

The working name for the station – Vaughan Corporate Centre – will not be the final name. The City of Vaughan has requested 'Vaughan Metropolitan Centre', the moniker that Vaughan has given to their new central business district plans, while the TTC prefers the name 'Vaughan Centre'. That shorter version would put the name in line with North York Centre and Scarborough Centre stations, and would avoid having to find a huge amount of space on maps to spell out.

Urban Toronto sides with the TTC regarding name: North York and Scarborough's stations are fine without the 'City' and 'Town' descriptions which are associated with the areas the station serve, and the issue of how long the name would become with 'Metropolitan' in it will become problematic for map and sign makers. Finally, Vaughan's insistence on including the grandiose word 'Metropolitan' smacks simultaneously of braggadocio and insecurity, which will be picked up on by many, who will be more likely to sneer at the name than be impressed. The simple name 'Vaughan Centre' is far more likely to have a positive impact on the city than the grasping longer version.

Find out how to promote this project on UrbanToronto
Expand/Collapse All   |   Export CSV
Project Information
Full data set available with a UTPro subscription
Earliest Application Date 0000-00-00 Construction Status Complete
Category Transit, Public Space / Park Construction Began 0000-00-00
    Completion Date 0000-00-00
Address Highway 7 & Millway Ave, Vaughan, Canada Other Addresses XXX XXXXXX XX, XXX XXXXXX XX
Latitude XXXXXXXXX Longitude XXXXXXXXX
Region XXXXXX Ward XX
MLS Zone XX    
Field Updates
XXXXXX XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX'.

XXXXXX XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX

XXXXXX XXX XXXX XXXXXX XXXX 'XXX XXXXXX' XX 'XXX XXXXXX
Project Attributes
Full data set available with a UTPro subscription
FAR/FSI XXXXXX Crane Number XX
Site Area XXXXXX XX Heritage XXX
Number of Buildings    
Maximum Height 0 ft / 0 m    
Maximum Storeys 0    
Underground Levels X    
Project Companies
Developer Toronto Transit Commission, Metrolinx
Architect Grimshaw Architects, Arup Canada
Engineering Fast + Epp
Roofing LiveRoof Ontario Inc
Services LRI Engineering Inc.
Other Paul Raff Studio, Precise ParkLink
Units
Full data set available with a UTPro subscription
Total Number Of Units Total Rental Units XXX
Building Units Hotel Units XXX
Market-Rate Rental Units XXX Freehold Units XXX
Condo Units XXX Other Units XXX
Unspecified Tenure Units XXX Affordable Rental Units XXX
    Rental Replacement Units XXX
Unit Mix
Full data set available with a UTPro subscription
Studios XXX    
1 Bedrooms XXX    
2 Bedrooms XXX    
3+ Bedrooms XXX    
Gross Floor Area
Full data set available with a UTPro subscription
Total GFA XXXXXX XX Office GFA XXXXXX XX
Commercial GFA XXXXXX XX Residential GFA XXXXXX XX
Industrial GFA XXXXXX XX Retail GFA XXXXXX XX
Institutional GFA XXXXXX XX    
Parking
Full data set available with a UTPro subscription
Total Vehicular Parking XXX Office Parking XXX
Residential Parking XXX Industrial Parking XXX
Visitor Parking XXX Institutional/Other Parking XXX
Retail Parking XXX    
    Bike Parking XXX
Access and Services
Full data set available with a UTPro subscription
Road Access XXXXXX XXXXXX Mass Timber XXX
Municipal Water XXXXXX XXXXXX Green Standards XXXXXX
Municipal Sanitary Sewers XXXXXX XXXXXX LEED Certified XXXXXX
Municipal Storm Sewers XXXXXX XXXXXX Passive Home Certified XXX
Other (Septic) XXXXXX XXXXXX    
Minimum Setbacks
Full data set available with a UTPro subscription
Front Lot Line Direction X Side Lot Line 1 Direction X
Front Lot Line Existing XXXXXX Side Lot Line 1 Existing XXXXXX
Front Lot Line Proposed XXXXXX Side Lot Line 1 Proposed XXXXXX
       
Rear Lot Line Direction X Side Lot Line 2 Direction X
Rear Lot Line Existing XXXXXX Side Lot Line 2 Existing XXXXXX
Rear Lot Line Proposed XXXXXX Side Lot Line 2 Proposed XXXXXX
Applications
Full data set available with a UTPro subscription
Primary Approval XXX
Submission Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
DevApp URLs XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
Application Types XXXXXX XXXXXX XXXXXXXXXXXX
XXXXXX XXXXXX XXXXXXXXXXXX
OLT URLs XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
Approval Status XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
Council Decision URLs XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
XXX: XXXXXXXXXXXXXXXXXXXXXXXX
Approval Sub-Status XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
Application #s XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
XXX: XXXXXX XXXXXX
Council Decision Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
OLT #s XXX: XXXXXX
XXX: XXXXXX
XXX: XXXXXX
Appeal Received Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
MZO #s XXX: XXXXXX
XXX: XXXXXX
XXX: XXXXXX
OLT Decision Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
   
MZO Dates XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
XXX: XXXX-XX-XX
   
Permits
Full data set available with a UTPro subscription
Links
Full data set available with a UTPro subscription
Website XXXXXXXXXXXXXXXXXX Registration XXXXXXXXXXXXXXXXXX
Email TYSSE@ttc.ca Social Media XXXXXXXXXXXXXXXXXX
Other XXXXXXXXXXXXXXXXXX    
Documents
Full data set available with a UTPro subscription
XXXXXXXX XXXXXXXXXXXX-XX-XX
XXXXXXXX XXXXXXXXX-XX-XX
XXXXXXXXXX XXXXXXXXXXXXX-XX-XX
XXXXXXXXXXX XXXXXXXXXX-XX-XX
XXXXXX XXXXXXXXXXX-XX-XX
XXXXXXXX XXXXXXXXXXXXXX-XX-XX
XXXXX XXXXXXXXXXXX-XX-XX
XXXXXXXXX XXXXXXXXXX-XX-XX
XXXXXX XXXXXXXXXXXX-XX-XX
XXXXXXXXX XXXXXXXXXXXXXXX-XX-XX
Something is not right? Let us know!
Forum
Buildings Discussion
Views: 50K  |  Replies: 161  |  Last Post: Aug 03, 2022

Member Photos  
  92 photos

News