News   GLOBAL  |  Apr 02, 2020
 8.4K     0 
News   GLOBAL  |  Apr 01, 2020
 39K     0 
News   GLOBAL  |  Apr 01, 2020
 4.7K     0 

  1. innsertnamehere

    Roads: Ontario/GTA Highways Discussion

    https://news.ontario.ca/en/release/1004362/a-new-deal-for-ottawa Ontario will also upload 174 in Ottawa. Any bets now on whether the Linc/RHVP and E.C. ROW are up next? The province is already paying for a new interchange on the EC ROW..
  2. innsertnamehere

    Toronto Toronto | 5 Raglan | 100.34m | 28s | Goldman Group | Richmond Architects

    Any development fronting onto the lane would be required to give their 1/2 of widening the lane to 6m.
  3. innsertnamehere

    Toronto Toronto | 45 Strachan | 131.97m | 39s | BentallGreenOak | Hariri Pontarini

    It won't end up this bad, to be clear - there is a lot of balcony cladding and brick work on the podium coming which should salvage it a bit. Definitely never going to be a looker though.
  4. innsertnamehere

    Niagara Falls Toronto | 6609 Stanley Avenue | 254m | 72s | Hariri Pontarini

    input costs are lower outside of Toronto on basically all fronts except materials and labour, but even those are a bit cheaper, from my understanding. The big "savings" come from lower land, approvals, and especially government costs. Development Charges tend to be a lot lower, especially if...
  5. innsertnamehere

    Toronto Toronto | Concord Sky | 299m | 85s | Concord Adex | a—A

    I'm not sure of these reactions. The design never changed substantially under Concord. Some renderings scared everyone off, but the building always continued with full curtianwall glazing.
  6. innsertnamehere

    Hamilton Toronto | Delta Secondary Redevelopment | 50m | 14s | New Horizon | Graziani + Corazza

    considering the two schools are over half a kilometre apart, I think it would be extremely, extremely unlikely.
  7. innsertnamehere

    Toronto Toronto | Concord Sky | 299m | 85s | Concord Adex | a—A

    Did the commercial component at grade change significantly? This has a pretty significant retail mix proposed now. P1 Food Hall, multiple at-grade retail spaces, L2 retail, and even L3 retail with a large patio space as well as a day care and community room on L3. I also note that this...
  8. innsertnamehere

    Toronto Toronto | Crosstown LRT | ?m | ?s

    Golden Mile will be lucky to have 1-2 buildings built and occupied by 2031. I'm not overly concerned about capacity on the surface section in the short term. The Crosstown can at the end of the day run 90 metre trains, which can hold about 700 people. It's also at the "end" of the line which...
  9. innsertnamehere

    Hamilton Toronto | Hamilton Line B LRT | ?m | ?s | Metrolinx

    to be clear I would be very surprised if the Brampton Line 10 extension happens before the Hamilton LRT. Metrolinx just has a very lethargic procurement process which the Hamilton LRT is slowly working it's way through. The Brampton LRT extension will have to go through that same process. Like...
  10. innsertnamehere

    Hamilton Toronto | King William Urban Rentals | 97.56m | 30s | LIUNA | Graziani + Corazza

    No but it’s extremely close. They were washing the windows today when I was walking by, occupancy is likely only days away.
  11. innsertnamehere

    Hamilton Toronto | Jamesville Redevelopment | 23.72m | 7s | Marz Homes | Invizij Architects

    Phases 1-3 only replaced I believe, correct. Phases 4 and 5, starting now, will result in a net increase from my understanding however. Regent Park is still the most affordable area of the wider downtown for newer condo buildings.
  12. innsertnamehere

    Hamilton Toronto | Corktown Plaza | 91.43m | 27s | Slate | Core Architects

    was it tabled at the request of the applicant?
  13. innsertnamehere

    Hamilton Toronto | Westgate on Main | ?m | 8s | Matrix Development Group | HB Design

    Just when you thought the lane closure was going to end!
  14. innsertnamehere

    Niagara Falls: Travelodge Redevelopment, 5599 River Road

    This project is deader than a doornail from my understanding.
  15. innsertnamehere

    Niagara Falls Toronto | 6609 Stanley Avenue | 254m | 72s | Hariri Pontarini

    I mean, it's not getting built, so who cares?
  16. innsertnamehere

    Hamilton Toronto | 405 Main Street West | 21.05m | 7s | 3H Properties | RevelHouse

    oh wow, I never expected this one to actually happen. Pleasantly surprised.
  17. innsertnamehere

    Toronto Toronto | The Birmingham | 13.11m | 1s | QuadReal | Ware Malcomb

    Electricity waste on these kinds of things isn't nearly as much as many assume as they are almost certainly LED lighting which draws basically no power. That entire display of overkill lighting probably burns less power than typical exterior lighting schemes of a decade ago. Doesn't mean it's...
  18. innsertnamehere

    Burlington Toronto | Nautique Lakefront Residences | 88.39m | 26s | Adi | Icon

    Yea this one is ugly as hell. Clearly value engineered to an inch of its life due to the construction delays on it.
  19. innsertnamehere

    Burlington Canal Lift Bridge Upgrades

    I believe they already reconstructed the pedestrian crossing as a part of the first phase. All that's remaining at this point is the approaches, then the project is done, from my understanding.
  20. innsertnamehere

    Roads: GTA West Corridor—Highway 413

    MTO has done the plans to do a 10-lane cross-section through Barrie and is actually more or less building it as we speak. They are doing a bunch of bridge replacements through there and widening the highway platform in preparation for the full widening as a part of it. The vast majority of...

Back
Top