Sept 15
These will be used in making the guide form for the secant wall.
P1290899.JPG


Nov 16
Guide completed and used -
P1340031.JPG

P1340017.JPG


P1340024.JPG
 
2/23
Secant Wall for the win - very deep pit.
P1400118.JPG


P1400120.JPG


Note how the ramps on this one respect the lines of the podium next door.
P1400124.JPG


P1400131.JPG
 
4/9
IMG_4823.CR2.jpg


IMG_4840.jpg


IMG_4828.CR2.jpg


Readying the secant wall for the second floor (bottom already poured).
IMG_4832.jpg


4/20
Readying the secant wall for the next floor.
P1420551.JPG


Holes for the rebar that will tie the floor into the secant wall.
P1420553.JPG


P1420554.JPG


Elevator cores taking shape.
P1420558.JPG
 
March 16 - From State and the river
32819757953_e9b46c45a1_b.jpg


Look closely and you can see a worker on a lift in the center.
33633464245_9da62a212a_b.jpg
 