The Waterfront For All Bathurst Silos Update last night included a lot of info on the pier rehabilitation. The City has appointed created a position to oversee the pier. They stated that the parking garage is being seen as a useful space to store equipment that is currently on the surface as well as housing the new cabling needed for projections/events. So far they have determined that there will be three components: a boardwalk/access point along the east side for marina access along the length of the pier. There will be some sort of permanent ‘park like’ design along the southern edge with seating, washrooms and landscaping. Finally the remaining central area will host events.

There was mention of some sort of wave deck on the north edge of the slip itself. The biggest emphasis will be to make the pier ready for events as soon as possible starting with an openhouse during Doors Open similar to last year’s Nuit Blanche event. Moment Factory, a very well-known and innovative projection/image company out of Montreal is doing the projection events.

Just an idea but someone did ask if there had been consideration to using the garage as an event venue which is something that I have thought of. The response was that to repair/waterproof the garage would cost a huge amount of money and funds are better spent on the surface. Fine. But is there an option to use a smaller portion of the garage? Maybe adjacent to the ramp which could be a theatre? 🤔
 
Last edited:
I'm a little confused, how do you use the garage for cabling and storing equipment if you don't address the waterproofing repair ? :)
Great question that I do not have an answer for but I will find the name of the City contact.
 
The tour of the pier on Tuesday night referenced the amazing work done with revitalizing piers in New York as inspirations for what could be done here for both design and programming. I have included a few links:





From Tribeca Film Festival at Pier 57:

IMG_1783.jpeg









IMG_1782.jpeg
 
Any chance we can get a tetrahedron shaped tower built behind this as well?
 
there will be three components: a boardwalk/access point along the east side for marina access along the length of the pier. There will be some sort of permanent ‘park like’ design along the southern edge with seating, washrooms and landscaping. Finally the remaining central area will host events.

There was mention of some sort of wave deck on the north edge of the slip itself.
I realize this may be just addressing what could be done sooner rather than later, but my spidey-sense 🕷️ is tingling... especially "some sort of wave deck". I know these are your words of course.

Hoping they're not backing away from the gorgeous concept first released. I realize it takes money but I really hope to see something like this huge waterfront gathering place... could be the best in class yet between Bathurst and Sherbourne.

53911-162899.jpeg

UT

Just love this.
 

Back