Cladding has appeared at the south end of the bus terminal:
upload_2017-1-26_13-49-26.png


upload_2017-1-26_13-49-55.png


upload_2017-1-26_13-50-24.png


upload_2017-1-26_13-50-45.png


Form work for a vent shaft:
upload_2017-1-26_13-57-7.png
 

Attachments

  • upload_2017-1-26_13-49-26.png
    upload_2017-1-26_13-49-26.png
    1.1 MB · Views: 452
  • upload_2017-1-26_13-49-55.png
    upload_2017-1-26_13-49-55.png
    1.1 MB · Views: 470
  • upload_2017-1-26_13-50-24.png
    upload_2017-1-26_13-50-24.png
    1.2 MB · Views: 426
  • upload_2017-1-26_13-50-45.png
    upload_2017-1-26_13-50-45.png
    1.3 MB · Views: 461
  • upload_2017-1-26_13-57-7.png
    upload_2017-1-26_13-57-7.png
    1.3 MB · Views: 446
We have updated our dataBase to reflect that "Stevens Group Architects / IBI Group Architects" has been folded into IBI Group. Though this project was originally partially credited to the old long form version of their name, the dataBase file now simply shows IBI Group as per their request.
 
April 10



755.jpg




The pictures of the main entrance should show the cladding colours a bit better.

705.jpg


707.jpg


715.jpg


717.jpg






I really appreciate the super wide sidewalks here, which are wide enough to fit a car. As for the utility poles in the middle of it: not cool.

713.jpg
 

Attachments

  • 713.jpg
    713.jpg
    2.9 MB · Views: 461
  • 707.jpg
    707.jpg
    1.7 MB · Views: 467
  • 755.jpg
    755.jpg
    1.5 MB · Views: 436
  • 715.jpg
    715.jpg
    2.8 MB · Views: 459
  • 705.jpg
    705.jpg
    2 MB · Views: 445
  • 717.jpg
    717.jpg
    2.3 MB · Views: 437
It's probably a temporary sidewalk and the utility poles could be temporary too

I doubt the new sidewalks are just temporary. This was the old version.



Screen Shot 2017-04-10 at 11.44.48 PM.png
 

Attachments

  • Screen Shot 2017-04-10 at 11.44.48 PM.png
    Screen Shot 2017-04-10 at 11.44.48 PM.png
    1.3 MB · Views: 669
Last edited:
May 14:

DSC_0316.JPG


DSC_0319.JPG


I'm starting to worry that this station risks pushing the project back into early 2018:

upload_2017-5-15_12-56-4.png
 

Attachments

  • DSC_0316.JPG
    DSC_0316.JPG
    1.9 MB · Views: 410
  • DSC_0319.JPG
    DSC_0319.JPG
    468.8 KB · Views: 419
  • upload_2017-5-15_12-56-4.png
    upload_2017-5-15_12-56-4.png
    239.3 KB · Views: 453
Is this thing supposed to be a fist wielding a spear, or am I looking at it wrong?

ljfy0Up.jpg

I'm glad we're getting the colourful design instead of the subdued concrete-and-glass Brutalist version that appeared in later renderings. However, we still haven't seen the cladding on the upper portion of the pavilion. Hopefully, it's the barcode pattern and not the concrete panels in this rendering.
 
May 14:

I'm starting to worry that this station risks pushing the project back into early 2018:

I'm worrying about the exact same thing. I wonder why progress has been so slow at this station, If i recall correctly, it had a head start (in terms of percent completed) compared to the other stations.
 
Last edited:
  • Like
Reactions: PMT

Back
Top