Are they not constructing the parkade for Phase 2 and 3 at the same time? I believe they are connected.
I would've thought the same but not entirely sure. If they are, then I'd expect to see all of the buildings in addition to El Mirador come down soon.
 
Post 278. "El Mirador Apartments, Patricia Annex, and Rochester Apartments) Phase 1". Its appears only north of the alley, https://www.openstreetmap.org/export#map=18/53.54158/-113.50562

And if that is all that is demolished before construction commences - it means the podium as originally envisioned is not happening.
My guess is the demolition is phased. As Chris noted, the parkade is likely connected, which make sense.

Multiple/many construction permits can be issued as part of the overall development permit.
 
F804405B-2974-4E43-9628-8CABB445E736.jpeg
83B0B3B0-7E78-4485-91EE-9B62453A9F27.jpeg
A21156EF-B5D2-4F74-A18B-2E424FA1792D.jpeg
8D8BBEDA-0AD5-497E-9274-FF79BFA871F8.jpeg
 
The tent was primarily beside The Bank Ultra Lounge on the south side of Jasper.
 

Back
Top