Lake Ontario
Active Member
Last edited:
No idea. Very slow.....Why is construction so slow on this? This is the most exciting development going on in Mississauga.
Maybe it is the asymmetric nature of the dig but it doesn’t look that deep. Looks like only 4 underground levels.
About damn time. Since all buildings are now full leased. Are all three being constructed in one go?A crane is up.
View attachment 349897
About damn time. Since all buildings are now full leased. Are all three being constructed in one go?
Indeed the lighting is pretty harshThat first photo gives me moon vibes