It is interesting that they made a point to market every 6th floor as a bench permiter. But did not market every 5th floor as hanger free.
 
Today. Looks like the off-site park dedication (on Dundonald) will be ready way before the retail, let alone the tower

135E00F3-58E1-4EE2-9805-4568ACF0B79E.jpeg


71575C12-B093-4A6D-8946-2618D9180126.jpeg
 
There was a time (back in April) when it was taking them 2-3 weeks to pour a slab and the walls for a level. That was the ninth floor, and I thought for sure we'd be to the first mechanical level by now. Speed will never apply to this project...
interesting the outer core form will be dragged along with the inner via those winches? this thing going to speed up
 
...that will be floor #13, I believe. And that's going to be 81 or 72 moar floors to go...depending on how The City feels about that!
 