What do you think of this project?


  • Total voters
    72
It’s also worth noting that the building’s main lobby entrance is from the plaza between the RAM. CN Tower, and the east end of EPCOR Tower, not from 101st Street.

Once the pedway link is completed, there will also be direct underground access all the way from The Switch to the Churchill LRT Station and to everything else linked to the Churchill LRT Station.
Hopefully EPS is worth their dollar for a change and keeps the pedway safe!
 
George Spady is also moving next year as well and that's right by this development too. If the Hope Mission in Dovercourt also pushes through then that could contribute to some changes as well.
Where is the Spady moving to? And is that building being torn down to be sold?
 
The Plaza just north of EPCOR Tower and The Switch. From Today.

PXL_20241008_135250965.RAW-01.COVER.jpg
 
External ID
315143826-064
Job Type
Major Development Permit
Description
To construct alterations to a Residential development - adding 12 Storeys and 188 Multi-unit Housing Dwellings to the east Tower. The total number of Dwellings is increasing from 504 to 692. This is part of a Mixed Use development with 2 Residential Towers and main floor Indoor Sales and Services Use and a 3rd floor Minor Indoor Entertainment Use (fitness facility).
Applicant
DIALOG
Status
Intake - Payment Required
Class of Permit

Create Date
October 21, 2024
Approval Date

Location
10423 - 101 STREET NW Plan 2321876 Blk A Lot 1
Neighbourhood
DOWNTOWN
 