judging by these notices, I'm guessing my move in date would be sometime in september 2010 which is fantastic for my personal situation.

I am surprised however that'll it take that long to get everything done. I'm would venture to guess that GGH is setting realistic time lines instead of overpromising and under delivering on the dates. I don't expect our move in dates will change much from these intial notices.

Agreed, I am surprised with the timing as I think the buidling is only 2-3 weeks away from topping-off. Maybe GG is just being realistic with the move-in dates. I prefer this approach vs. push back and over promises.

As for the buidling getting regestered, GG has an amazing rep. and some buildings took only 1 month once occupied.
 
has anyone else received mail from GG? Im on one of the lower floors and havent got anything yet.
 
has anyone else received mail from GG? Im on one of the lower floors and havent got anything yet.

Are they allowing assignments at X? I missed the preconstruction stage, but would consider an assignment or a resale.

Any potential sellers can PM me.

PS I AM NOT AN AGENT, BROKER, SALES REP .....
 
I haven't received anything from GGH yet but i'm on the 30th.

alright... just excited about the upcoming updates.


Also, -it`s been a couple of months since my upgrade selections... but if I wanted to purchase an additional upgrade (countertops), -do you guys think it would be too late?
 
X Condo.. i think all the residential floors are done!... CAN'T WAIT to see this view in 3 or so years.. with Boutique, X2!.. gonna get crowded!!!

4050302323_b42bd01121_b.jpg


4051075616_435f049b9f_b.jpg



All photos by me: steveve

:)


***timeline comin up!
 
Hey guys... I took a photo of X condo yesterday...

I put together a little timeline of shots i've taken over the past couple of months...

X Condo TIMELINE!!!!!!!!


JULY 30, 2009:

3777720909_dc56e60eb6_b.jpg



SEPTEMBER 3, 2009:

3887060695_1a4a59a969_b.jpg




SEPTEMBER 21, 2009:

3945930150_6864175a52_b.jpg



September 28, 2009:

3966453419_f822ce9123_b.jpg



October 26, 2009 YESTERDAY (residential floors topped off!):

4050302323_b42bd01121_b.jpg




All photos by me: steveve

Enjoy :)
 
Received my occupancy letter from GGH today and it's set at Jan 10, 2011. Unit is at the 30th floor.
 
2011 ... that's more than a year away?

Yup. I don't mind, gives me more time to save up. lol

For those of you interested to see what our Amana slide-in ranges will look like, refer to:

http://urbantoronto.ca/showpost.php?p=338167&postcount=1852
(from the Casa thread, posted by 'dventura' during his PDI).

Luckily though, -we get a better fridge (it should be the bottom freezer stainless steel version, -not the silver/faux stainless steel fridge that Casa buyers get).

So which one of these will be ours?

http://amana.com/catalog/category.jsp?parentCategoryId=588&categoryId=731
 

Back
Top