Paclo

Administrator
Staff member
Member Bio
Joined
Aug 25, 2020
Messages
2,056
Reaction score
8,533

Brookdale Centre Redevelopment: a proposed multi-phased, mixed-use residential, retail & public space development designed by Turner Fleischer Architects for Tribute Communities on the south side of Kingston Road, east of Dixie Road, west of Liverpool Road and north of Highway 401 in Central Pickering.

3.-Architectural-Set_1101_1105_1163_KingstonRD-10.jpg
3.-Architectural-Set_1101_1105_1163_KingstonRD-11.jpg
3.-Architectural-Set_1101_1105_1163_KingstonRD-12.jpg
3.-Architectural-Set_1101_1105_1163_KingstonRD-13.jpg
3.-Architectural-Set_1101_1105_1163_KingstonRD-14.jpg
3.-Architectural-Set_1101_1105_1163_KingstonRD-15.jpg
3.-Architectural-Set_1101_1105_1163_KingstonRD-16.jpg
3.-Architectural-Set_1101_1105_1163_KingstonRD-17.jpg
3.-Architectural-Set_1101_1105_1163_KingstonRD-18.jpg
3.-Architectural-Set_1101_1105_1163_KingstonRD-19.jpg
3.-Architectural-Set_1101_1105_1163_KingstonRD-20.jpg
3.-Architectural-Set_1101_1105_1163_KingstonRD-21.jpg
3.-Architectural-Set_1101_1105_1163_KingstonRD-22.jpg
3.-Architectural-Set_1101_1105_1163_KingstonRD-23.jpg
 

Public Open House Meeting​

Date:Thursday, May 30, 2024
Time:6:00 pm to 9:30 pm (presentation begins at 6:30 pm)
Location:Chestnut Hill Developments Recreation Complex (Banquet Hall East & West Salon)
1867 Valley Farm Road, Pickering, ON L1V 3Y7

Additional perspectives:
3.-Architectural-Set_1101_1105_1163_KingstonRD-9.jpg

3.-Architectural-Set_1101_1105_1163_KingstonRD-8.jpg


Master / Phasing Plan:
3.-Architectural-Set_1101_1105_1163_KingstonRD-08.jpg
 
And Metrolinx still hasn’t started the BRT 🥴. Not sure if that plan is still feasible for all this development coming soon.
 
It would be incredible to see a bike path built at bare minimum across the wetland to connect over with the north GO station entrance. If it was up to me and I had no budget, I would do a bridge over Liverpool and the 401 to connect with the west end of the platforms and the southern station entrance. It would take so many cars off the roads around here which are already choked at rush hour.

A lil' somethin' like this:
Screenshot 2024-04-26 145723.png
 

Attachments

  • Screenshot 2024-04-26 144551.png
    Screenshot 2024-04-26 144551.png
    2 MB · Views: 8
It would be incredible to see a bike path built at bare minimum across the wetland to connect over with the north GO station entrance. If it was up to me and I had no budget, I would do a bridge over Liverpool and the 401 to connect with the west end of the platforms and the southern station entrance. It would take so many cars off the roads around here which are already choked at rush hour.

A lil' somethin' like this:
View attachment 559468
Liverpool rd has planned winding including cycling infra; in addition, Walnut lane extension will have a MUP on the north side. GO also has a project to build a better connection (pedestrian ramp) connecting liverpool and the station (project ON-LSEPKGO-03), of which I hope they add cycling connections... Especially that all cycling facilities at the station are near this location.
 
It would be incredible to see a bike path built at bare minimum across the wetland to connect over with the north GO station entrance. If it was up to me and I had no budget, I would do a bridge over Liverpool and the 401 to connect with the west end of the platforms and the southern station entrance. It would take so many cars off the roads around here which are already choked at rush hour.

A lil' somethin' like this:
View attachment 559468
This would be awesome
 

Back
Top