There are a bunch of machines and setup going on in this block. 4A, 4B, and 4C. Drilling rig is on site as well now...

20251123_151354.jpg


20251123_151532.jpg


20251123_151623.jpg
 
Last edited:
That large pool of water at 4C may have slowed them down but it's not stopping them. They appear to already have drainage set up while all the machines dig out 4A. 😅

20251124_124424.jpg


And this appears to be the main gate right now. A little "Tridel" booth on the south west side of 4C.

20251124_124837.jpg
 

Back
Top