What do you think of this project?

  • I dislike it

    Votes: 0 0.0%
  • I dislike it a lot

    Votes: 0 0.0%

  • Total voters
    42
IMG_0761.jpeg


North building. Still no main floor poured on south building.

IMG_0760.jpeg
 
No worries lol. I promise that as someone who worked retail for a decade and sometimes drives the HLB Streetcar, I try to have a *liiiittle* self awareness when out in public 😂

Fun fact: Our U2s are technically a sub-class called RTE 1 (Calgary's are RTC 1). This is because each city requested modifications from the original U2 class. Many changes were due to our much harsher winters than Germany's (e.g., extra heating and double windows), but one unrelated change was to disconnect the passenger alarm levers from the emergency braking system. Now *that* would have been a great way to improve my picture quality :p
 
Last edited:

Back
Top