The most exciting photo update of the entire project!

IMG_6020.jpeg
 
The current closure of 14th Ave that began on March 30 is expected to last into the fall. The plan is to raise the street by 2 meters.
2 meters seems like a lot. Is 14th ave currently lower than other streets? Or is it going to have a ramp between 14th Ave and Stampede Trail/5A?
 
Reading the DP set I have, the survey grade at 14th Ave & 5A St. is 1042.11m and it appears it will be raised to at least 1043.10m. West end is 143.27m.
 