Things are happening?
IMG_3994.jpeg
IMG_3994.jpeg
 
From the pictures The street is currently undergoing significant construction for both underground infrastructure (including the Ontario Line subway) and surface upgrades like water main replacement, streetcar track renewal, and cycling and pedestrian path improvements. Any construction equipment at the back of the building?
 
From the pictures The street is currently undergoing significant construction for both underground infrastructure (including the Ontario Line subway) and surface upgrades like water main replacement, streetcar track renewal, and cycling and pedestrian path improvements. Any construction equipment at the back of the building?
Walked by here and couldn’t get a good photo because it’s covered up by a solid gate…

But Orin does have excavation equipment behind the building now. Though, they weren’t working.
 
Natasha site preparation activities are continuing - some photos from last week. The stabilizing blocks for the heritage facade retention system have been delivered and are now on site. Some additional demolition activities have been completed.

20260330_125928.jpg


20260330_130012.jpg


From Adelaide Street, looking through to the south side of the site and the building on Pearl Street:

20260330_125745.jpg


From the south side of the Natasha site:

20260330_130344.jpg
 