It either broke down...or they don't need it anymore.Actually being lifted out of the pit, not being lowered in!
It either broke down...or they don't need it anymore.Actually being lifted out of the pit, not being lowered in!
Metrolinx announces that excavation at King-Bathurst is complete.
View attachment 715029
![]()
Ontario Line station update: King-Bathurst construction progress revealed - NOW Toronto
What to know As construction of the Ontario Line continues, Metrolinx and the provincial department of transportation announced a major step in the process on...nowtoronto.com
Any guesses on how quickly they build the station up to street level? There are years of work left but I suppose pouring the station box will change the nature of construction activity. Dump trucks replaced with technical equipment and trades. I wonder if the acoustic tent on the north side will remain in place for weather proofing the site or if it'll get in the way and a more traditional open air construction will continue. How was it done on the Eglinton Crosstown stations?
"Arriving at, "bad PS2 station. Bad PS2 station. Doors will open on the left"The top half of this photo is pretty trippy. Without the bottom half I'd think it's the worst artist rendering I've ever seen. It reminds me of bad PS2 graphics.
Fun fact: these cavern formworks are custom built in India and shipped here for assembling.March CLC docs are out. The Crown Lining Formwork is hella cool!
Left in a few extra slides outside of the construction updates because they feature good photos.
View attachment 727661
I don't want to know about how much they cost.Fun fact: these cavern formworks are custom built in India and shipped here for assembling.
Quite the construction and engineering excellence on the southern civil team, unfortunately the same can’t be said across all contracts.I don't want to know about how much they cost.
No wonder this line has such a ridiculous cost.. Watching it get built, Metrolinx is going for ridiculously expensive custom solutions for basically everything.
Technically EEB at Ordnance, but probably not a great photo-op.I think the KB Station is the first stop where those boring machines will be poking their heads through if I got that right...
The RFQ is from the contractor, not Metrolinx. Believe it or not there is no expertise in North America for this, and yes it has to be custom built. Each supplier even has different design.I don't want to know about how much they cost.
No wonder this line has such a ridiculous cost.. Watching it get built, Metrolinx is going for ridiculously expensive custom solutions for basically everything.
lowest cost one lolThe RFQ is from the contractor, not Metrolinx. Believe it or not there is no expertise in North America for this, and yes it has to be custom built. Each supplier even has different design.
2 Italian suppliers with manufacturing facilities in Indonesia and India, 1 Spanish supplier with manufacturing facility in Turkey, 1 Turkish supplier, 1 Swiss supplier with European manufacturing.
Can you guess the winner from the proposed solutions below ?
1.
View attachment 727686
2.
View attachment 727687
3.
View attachment 727688
4.
View attachment 727689
5.
View attachment 727690