Complete?
IMG_0859.jpeg

Shot Dec 25, looks like there is still work underway is supposed to open next month I believe.
 
2026-04-09
Branksome Hall iCAST construction tour
IMG_0700.jpeg


Pitch space from two angles. Seats ~80.
IMG_0703.jpeg
IMG_0708.jpeg


Audio and video recording and broadcast studio. Acoustic tiling is in, so the room was eerily silent.
IMG_0706.jpeg


Robotics construction and battle arena (foreground) and wood and metal shops (behind). Windows to Mt. Pleasant Blvd. at left.
IMG_0709.jpeg


~320 removable seat black box theatre with tension grid above
IMG_0728.jpeg
IMG_0739.jpeg
IMG_0736.jpeg


Permanent ‘Noodle’ facility (student business accelerator) and view across green roof and Branksome Hall campus to One Bloor West and Yonge/Bloor skyline.
IMG_0725.jpeg
IMG_0732.jpeg


Views across Mt. Pleasant Blvd. and Branksome Hall pedestrian bridge to the Athletics & Wellness Centre also by MJMA.
IMG_0741.jpeg
IMG_0740.jpeg


Exterior
IMG_0745.jpeg
 

Attachments

  • IMG_0700.jpeg
    IMG_0700.jpeg
    265.2 KB · Views: 3
  • IMG_0741.jpeg
    IMG_0741.jpeg
    243.4 KB · Views: 3
Last edited:

Back
Top