Snapped a pic on my walk this evening.
When I reached out to the builder to clarify whether it is in the main tower or shorter tower, they didn't seem to understand my question.Very common for buyers to join UT to keep up with what is happening to their building as well posting issues and asking questions how to deal with various issues.. There are owners from the first two towers here still today.
Since you are on the nineth floor, you will be one of the first batch of owners to move in next year.
Are you in the main tower or the short one? With the building at the 12 floor for the short tower with the 13th floor in place for the main tower. still have 37 floors plus the mechanical floors to go. That could be built in about 42 weeks depending on the weather and winds. This will take you into to late December for the tower to be built and by summer of 2027 for full move in. How the move in will be handle for the short tower, I have no idea as this is the first I have come across over the years.
Would ask this way I/we bought a unit on the nine floor of the smaller 12 story tower that is part of the 50 story tower and would like to know when we will be allow to move into our unit? Will it be this fall while the rest of the 50 story tower is being built or will it be after the 50 story tower is top off? The 50 story tower is currently at the 14th floor and it looks like it will be the end of 2026 that it will be top off with move in by summer of 2027 for the lower levels.W
When I reached out to the builder to clarify whether it is in the main tower or shorter tower, they didn't seem to understand my question.
No parking on the surface but parking in the podium for haft of the south end'.*Whispers quietly: Is that a...parking lot?" >.<
I wouldn't worry about it since Flickr has an issue these days deleting the links to my photos. Have raise this issue with Flickr along with a number of other ones that go back two decades. It not surprising to see other people shoot the same view or close to it of X since everyone shoots different as well look for that X shot.Damnit I took a few pics on my walk today but just noticed that some of my shots duplicate yours, drum.
Whatever, I'm posting them anyway lol.
View attachment 723878View attachment 723879View attachment 723880View attachment 723881
That's what I was referring to. Because no way is that slab part there an office tower as this building is a residential to my understanding..No parking on the surface but parking in the podium for haft of the south end'.
It was never to be an office building other than having commercial units at grade. Then that tower came about when the original land owner finally sold the land after the 2nd tower was being built that they couldn't fund the building they wanted to build since day one, The city refused the developer request to reduced the amount of parking spots to less than the 50% that was approved in the first place. The developer only wanted 40% of parking requirement than the 25% they wanted in the first place.That's what I was referring to. Because no way is that slab part there an office tower as this building is a residential to my understanding..
I get that...I was more curious about that stacked parking lot being built there to my horror. Thanks for clarifying that though. /bowsIt was never to be an office building other than having commercial units at grade. Then that tower came about when the original land owner finally sold the land after the 2nd tower was being built that they couldn't fund the building they wanted to build since day one, The city refused the developer request to reduced the amount of parking spots to less than the 50% that was approved in the first place. The developer only wanted 40% of parking requirement than the 25% they wanted in the first place.
Requirement for office towers for MCC has been dead for decades with some towers having trouble finding tenants. The Exchange towers replace an outdated office tower that was less than 50% lease.
Sure, i'll give this a try!Would ask this way I/we bought a unit on the nine floor of the smaller 12 story tower that is part of the 50 story tower and would like to know when we will be allow to move into our unit? Will it be this fall while the rest of the 50 story tower is being built or will it be after the 50 story tower is top off? The 50 story tower is currently at the 14th floor and it looks like it will be the end of 2026 that it will be top off with move in by summer of 2027 for the lower levels.
I have already noted after that posting that anyone in the 12 story tower will move in late 2027 as there is no mechanical equipment for it until the 51-53 floors are built for the main tower as those will service both towers.Sure, i'll give this a try!
Thank you!!
This was the response from the ORO edge team:I have already noted after that posting that anyone in the 12 story tower will move in late 2027 as there is no mechanical equipment for it until the 51-53 floors are built for the main tower as those will service both towers.
The have poured the 15th floor slab and pouring the columns and walls for that floor. They are no doing a floor a week yet and that is poor.
No based on info given to me that stated until the three floors of mechanical is built above the 50 floor tower and that will be in early February or March 2027 for completion, there will be no heat, water or hydro. That said, there is supposed mechanical equipment on the 25th floor and is that is enough to service the 12 story tower and cannot get a straight answer to it. The 16th floor should be pour by the end of next week that will be the week of the 21st and nearly two week a floor. To get to the 26th floor, you are looking at either 9 to 15 weeks from April 21st depending if they can reduce the time frame per floor.This was the response from the ORO edge team:
Thank you for your email. Your tentative occupancy date is January 21, 2027. We are likely to further extend this date and provide you with a new tentative occupancy date. Once we provide you with a firm date, that will be when you are able to occupy your unit. It will be when all construction is completed for both towers.
Do you think this is reliable?
Hi, thank you for the detailed review.No based on info given to me that stated until the three floors of mechanical is built above the 50 floor tower and that will be in early February or March 2027 for completion, there will be no heat, water or hydro. That said, there is supposed mechanical equipment on the 25th floor and is that is enough to service the 12 story tower and cannot get a straight answer to it. The 16th floor should be pour by the end of next week that will be the week of the 21st and nearly two week a floor. To get to the 26th floor, you are looking at either 9 to 15 weeks from April 21st depending if they can reduce the time frame per floor.
This puts the mechanical floor in place for equipment to be installed around the end of June to mid August with another few months for insulation.
At the same time, elevators cannot be installed until the 51-53 floors are in place unless there is a plan to have two short elevators to service the 12 story tower. that will be while over 100 residents per elevator standards with long waits for one.