  1. A

    Sugar Wharf Condominiums, Phase 1 (Menkes) - Real Estate -

    And more particularly - the City building inspectors have signed off on the key life safety systems in the sections of the building for which an occupancy permit is being sought.
  2. A

    Hurontario LRT | Metrolinx

    Simple reason - the more complex, long lead time items are generally started first, so that both they, and the more straightforward areas are completed at roughly the same time. Can you imagine the frustration, the public uproar, if the vast majority of the visible work were to be completed a...
  3. A

    Toronto | The Well | 174.03m | 46s | RioCan | Hariri Pontarini

    Saturday morning - October 16: The Well's office tower crane is coming down.
  4. A

    Toronto | The Well | 174.03m | 46s | RioCan | Hariri Pontarini

    October 15, 2021: Major milestone in The Well project - the tower crane for the office tower building is coming down. Already partially disassembled.
  5. A

    Toronto | The Well | 174.03m | 46s | RioCan | Hariri Pontarini

    Assembly of the derrick has been completed, it is now operational and being checked out.
  6. A

    Toronto | The Well | 174.03m | 46s | RioCan | Hariri Pontarini

    October 13, 2021: Almost a major milestone, but not quite yet. Getting ready to take down the tower crane from The Well's office tower. The jitney crane (sorry - do not know the proper technical term) is now being installed on the roof. The main three legged structure of the jitney crane has...
  7. A

    Toronto | 64-86 Bathurst | 68.3m | 17s | Hines | 3XN

    October 13: Lots of activity on the site this morning. Shoring rig is active, two concrete trucks on the site, and a mobile crane is lifting a steel shoring pile to put in one of the shoring holes. The former rental residential building at the south-east corner is still standing though...
  8. A

    Toronto | The Quay, Tower Three (was Maple Leaf Quay) | 66.44m | 21s | Pacific Reach | BDP Quadrangle

    October 11: Demolition of the 370 Queens Quay building now well underway.
  9. A

    Toronto | The Well | 174.03m | 46s | RioCan | Hariri Pontarini

    October 10, 2021: Sunday morning of the Thanksgiving Holiday long weekend - 8 AM. The big push appears to be on. After working until 2 PM yesterday, the tower crane and external construction hoist for The Well office tower are already at work this morning. Edit: Late morning - sun now...
  10. A

    Toronto | The Well | 174.03m | 46s | RioCan | Hariri Pontarini

    Saturday morning of the Thanksgiving Holiday long weekend - and The Well's office tower crane is working as usual. The only crane active today of the many which are visible from our place.
  11. A

    Toronto | The Well | 174.03m | 46s | RioCan | Hariri Pontarini

    October 7: Installation of concourse overhead components between buildings B and C:
  12. A

    Toronto | The Well | 174.03m | 46s | RioCan | Hariri Pontarini

    October 4, 2021. Looks like the structure lying horizontally on top of the roof on the left would be the Building Maintenance Unit in its resting position. Additional notes on the office tower below the photo. The tower crane has been working very long hours for quite a while. There is...
  13. A

    Toronto | The Well | 174.03m | 46s | RioCan | Hariri Pontarini

    Sunday, October 3: Activities continuing on the office tower over the weekend. The tower crane was active all day Saturday, and again Sunday morning. Specific progress items. It looks like the BMU - Building Maintenance Unit - for the office tower is installed and operrational, earlier in...
  14. A

    Ontario Line : King-Bathurst Station - (North 25 s + South 25 s) - Infrastructure Ontario

    Threads already exist for these two projects - including updates about Metrolinx preliminary plans for the stations on these sites: 663 King West | 66.12m | 17s | TC | Core Architects Pre-application consultation at...
  15. A

    Ontario Line (was Relief Line South, in Design)

    Threads already exist for these two projects - including updates about Metrolinx preliminary plans for the stations on these sites: https://urbantoronto.ca/forum/threads/toronto-663-king-west-66-12m-17s-tc-core-architects.26468/...
  16. A

    Waterworks (MOD Developments) - Real Estate -

    I guess the lack of a single standard definition for the term 'completion' is part of the problem. Buildings may meet agreed criteria to be 'substantially complete' from a contract perspective, triggering payment obligations between the parties - yet still have material amounts of work tob e...
  17. A

    Toronto | The Well | 174.03m | 46s | RioCan | Hariri Pontarini

    Silva Cells. Google items about them at...
  18. A

    Waterworks (MOD Developments) - Real Estate -

    The Registration issue has been addressed (by me) a number of times on various UT threads - to the point where a stock response has been offered for UT to use. From a former comment: - yet again another question, this time in the 488 University thread, about when condominium purchase closing...
  19. A

    Toronto | The Well | 174.03m | 46s | RioCan | Hariri Pontarini

    September 26: Activities on the south side Wellington Street Boulevard are continuing, both in front of the 401 Wellington West building, and work has started on the boulevard frontage of the Osmington Building at the corner of Wellington West and Draper Streets. And further down the...
  20. A

    Toronto | QRC West Phase 2 (Queen Richmond Centre West) | 35.96m | 7s | Allied | Sweeny &Co

    Excavation work continuing at QRC West Phase 2 - Photo taken today (Monday, September 26)