News   GLOBAL  |  Apr 02, 2020
 6.9K     0 
News   GLOBAL  |  Apr 01, 2020
 35K     0 
News   GLOBAL  |  Apr 01, 2020
 3.5K     0 

  1. N

    Toronto skyline

    Canadian Phoenix Steel Products and the GO Transit Willowbrook Yard railyard. The Toronto South Detention Centre is left of the railyard and to the right of the railyard is the Ford Performance Centre (Where the Toronto Maple Leafs practice)
  2. N

    Toronto skyline

  3. N

    Mississauga Dixie Rd/QEW New Interchange (MTO, 1s, AECOM)

    Beams over the QEW Westbound lanes. Anyone know when the Eastbound beams go up?
  4. N

    Mississauga Toronto | Lakeview Village | ?m | ?s | Argo Developments | Sasaki

    New Peel Region Parks building Old Peel Region Parks building. Trees and shrubs recently removed along Lakefront Promenade. Sales Office Jim Tovey Conservation area still taking shape.
  5. N

    Mississauga Toronto | Avonhead Industrial Campus | 14.29m | 1s | Carttera | Baldassarra Architects Inc

    Sandusky, Ohio that is correct. Yes, Cedar Point! Too bad they retired the "Top Trill Dragster".
  6. N

    Toronto skyline

  7. N

    Mississauga Toronto | Avonhead Industrial Campus | 14.29m | 1s | Carttera | Baldassarra Architects Inc

    I'm not sure what's going on at this site, but it's directly to the North. Structural steel has been delivered and tower crane components. Not sure if it's the materials for the Industrial Campus being stored here or another project.
  8. N

    Mississauga Toronto | Avonhead Industrial Campus | 14.29m | 1s | Carttera | Baldassarra Architects Inc

    The large Ash Grove CRH Cement plant across the street. Loads of Limestone come in from Colborne, Ontario by ship. The Slag loads come from Nanticoke, Ontario and Coal from Sandusky or other ports. Empty railcars are spotted and loads pulled by CN. Coal to the left on the circular pad and slag...
  9. N

    Mississauga Toronto | Avonhead Industrial Campus | 14.29m | 1s | Carttera | Baldassarra Architects Inc

    557 & 587 Avonhead Road. Phase I — 362,000 SF with occupancy Q4 2023 Phase II — 378,000 SF with occupancy Q4 2024 https://avonheadcampus.com/
  10. N

    Mississauga Toronto | Lakeview Village | ?m | ?s | Argo Developments | Sasaki

    Well it looks like this new building is the new home for the Peel Region. I assume the old building (photo2) will be torn down soon as protection now surrounds the growth on that back hill.
  11. N

    Mississauga Dixie Rd/QEW New Interchange (MTO, 1s, AECOM)

    I didn't even realize that pedestrian bridge was gone. :)
  12. N

    Toronto Toronto | Minto Long Branch | ?m | 4s | Diamond Corp | Guthrie Muscovitch

    Thanks, it's the wide angle lens attachment.

Top