News   GLOBAL  |  Apr 02, 2020
 7.8K     0 
News   GLOBAL  |  Apr 01, 2020
 38K     0 
News   GLOBAL  |  Apr 01, 2020
 4K     0 

  1. D

    Roads: Gardiner Expressway

    MTO can always update a standards to have rural highway and urban highway standards. Land is expensive and having 14 meters on either side sit vacant is fine in a rural context. In a city it's a waste of resources and potential tax revenue. Build it an people will buy as has been seen with all...
  2. D

    Roads: Ontario/GTA Highways Discussion

    Yes they should 100%. Something smiliar to the Morriston bypass design. 2 lanes in both directions with concrete medium. Access roads on the side and grade separate. MTO has to stop with the either they build a super highway with a 100m ROW or nothing at all.
  3. D

    The Meadoway, 200ha

    anyone notice that the Slow painted on the pavement is facing people travelling up the hill. I think that was a mistake as it makes way more sense to have the Slow marking for people travelling downhill.
  4. D

    Roads: Ontario/GTA Highways Discussion

    Just bringing forward the renderings. Also, I like everything, but I wish they added sound barriers to the bridge, so the noise from traffic wouldn't carry very far through the ravine. I used to live by the rouge river and the noise would travel from the 401 to lake Ontario. The same sound...
  5. D

    Roads: Traffic Signals

    Raised crosswalks and intersections are great but not for thru routes. They are used on local or service routes. Each is a tool in the tool box, which are is most effective when used properly. Raised crosswalks on thru routes will created unnecessary congestion thinking roads such as dundas or...
  6. D

    Roads: Traffic Signals

    Yes so rrfb signals above the crosswalk with led lights lighting up the area underneath. But as far as I know thats not in the ontario standard. Should be though.
  7. D

    Toronto Toronto | GO Transit: Davenport Diamond Grade Separation | ?m | ?s | Metrolinx

    Yes but it could be organized by the community in the future. Metrolinx wouldn't care if they don't have to pay for it.
  8. D

    Toronto Toronto | GO Transit: Davenport Diamond Grade Separation | ?m | ?s | Metrolinx

    I like to think that the panels can have an art pieces installed on top if funding and wellness partners come forward.
  9. D

    Roads: Traffic Signals

    Ya toronto still has not switched to the rrfb signs that are installed all over ontario and North America. The lights are more "aggressive" which increases compliance and safety.
  10. D

    Roads: Traffic Signals

    So I just visited halifax and saw how little traffics lights there are. Pedestrian crossing are used very often and allow safe mid block crossing. Traffic moves effectively and is only stopped when required. I am convinced a sizable amount of congestion in Toronto is due to city council and...
  11. D

    Roads: Highway 401 Widening - Highway 8 to Highway 410 (MTO, U/C, Planned)

    Hov lanes should be only for transit vehicles buses. They also need to be separated with flexy posts. All you do is place license plate readers at certain points and automate the enforcement for offenders
  12. D

    Roads: Ontario/GTA Highways Discussion

    Appreciate the response, thanks
  13. D

    Roads: Ontario/GTA Highways Discussion

    If anyone can answer. I've always wondered why in B.C., quebec and the US on its interstates the pavement on bridges uses a concrete road surface but in ontario the MTO uses asphalt on bridges. Why the difference one must be better for safety so I would assume that the standard would be universal.
  14. D

    Toronto Toronto | Crosstown Line 5 West Extension | ?m | ?s | Metrolinx

    Brah so they pretty told everyone to go f*** themselves. Can we have indoor bike parking, secondary entrances so kids don't have to cross high speed traffic. Metrolinx. Hears a bike canopy with bike exposed to theft because they will be on the side of the station in a low traffic area. The...
  15. D

    QEW Credit River Bridge threatened

    I believe the final layout is 4 in each direction with proper shoulders on the bridge.
  16. D

    Metrolinx: Finch West LRT

    honestly, thats a great idea. You would keep the T but the colour would identify the service type. Montreal did something similar, check the thread.
  17. D

    Bruce Power: New Nuclear Generation Capacity

    So looks like Pickering nuclear station will be extended until 2026. I fully agree with the posted article below and see that with the expertise gained at Darlington, Pickering should be even easier to refurbish. I would also add that once the A side is full decommissioned they could plan on...
  18. D

    Metrolinx: Finch West LRT

    Hopefully the T is reflective or light up so it could be seen at night.
  19. D

    Bruce Power: New Nuclear Generation Capacity

    honestly that organization has been dragging its feet for so long. The government should tell them to select a site or they clean house, because clearly they are milking the system at this point. https://implementationplan.nwmo.ca/2023_27/planning-timelines/ so created in 2002 and will...
  20. D

    Roads: Gardiner Expressway catch-all, incl. Hybrid Design (2015-onwards)

    I think that whats going to happen is all the Rehabilitation contracts will be canceled. Olivia will wait and get a transportion toronto report that states the gardiner is unsafe to use and will close it down for public safety. Only hope is ford has the MTO take over.

Top