News   GLOBAL  |  Apr 02, 2020
 9.6K     0 
News   GLOBAL  |  Apr 01, 2020
 41K     0 
News   GLOBAL  |  Apr 01, 2020
 5.4K     0 

  1. yoshirocks702

    Finch West Line 6 LRT

    According to the rendering there will be 3 lanes of traffic each way plus the lrt lanes plus an on ramp and a side walk so I'm guessing there is enough room under the existing bridge so they don't have to make it wider. Which would make sense why they are doing the RBR
  2. yoshirocks702

    Finch West Line 6 LRT

    Theres also that huge 20+ acre plot NE beside Albion. https://www.thestar.com/news/queenspark/2017/11/01/thistletown-land-pledged-for-mixed-income-community.html
  3. yoshirocks702

    Finch West Line 6 LRT

    I think this is an old design, they are leaving a 32m right of way along Finch for future development.
  4. yoshirocks702

    Toronto Toronto | Lawrence Allen Centre | ?m | 4s | RioCan | Pappas

    Don't forget the Albion Centre lol (although to be fair this has been named albion centre for a long time, previously Shoppers World Albion)
  5. yoshirocks702

    Pickering Toronto | Pickering City Centre | 174m | 55s | CentreCourt | Diamond Schmitt

    Crane is for this project here I believe, which is north of the 401 and close to PTC. https://urbantoronto.ca/forum/threads/1450-pickering-parkway-pickering-8s.29286/ Here is universal city condos, on the south side of the 401, they started shoring for this one recently so a crane should come...
  6. yoshirocks702

    Finch West Line 6 LRT

    No pictures but they have fenced off and have equipment staged at the north-east and south-west sections of the Highway 400 on-ramps for the bridge replacement. Edit: 8/29/2019 site clearing has begun!
  7. yoshirocks702

    Toronto Casa Emery Village | 165.09m | 55s | Medallion | Arcadis

    Excavation looks done but no sight of concrete or tower cranes yet. They are definitely taking their time, the front of the primo tower still isn't landscaped yet.
  8. yoshirocks702

    The Toronto Tree Thread

    With the amount of rain we had this year I don't think we even need those bags lol (maybe that's why they aren't filling them?). On another note they did plant a bunch of trees at the local park with these bags and I did see crews filling them up once every 2-3 weeks last summer but I don't...
  9. yoshirocks702

    Toronto Toronto | 1326 Wilson Avenue | 45.5m | 10s | Winzen | Tregebov Cogan Architects

    Land is for sale cheap only $1 I only have 88 cents currently lol https://www.realtor.ca/real-estate/20320554/vacant-land-1326-wilson-rd-toronto-downsview-roding-cfb I wonder if next door will buy it and combine the lots...
  10. yoshirocks702

    Toronto Casa Emery Village | 165.09m | 55s | Medallion | Arcadis

    Quick pic from today, shoring looks done they have started excavation on Ph2
  11. yoshirocks702

    Vaughan Toronto | Transit City Condos | 176.17m | 55s | CentreCourt | Diamond Schmitt

    Quick cell pic yesterday, also shows Expo city 3 and 4, topped off met and the pretty much done YMCA center. VMC is progressing.
  12. yoshirocks702

    Toronto Plaza Hotel - 1677 Wilson Avenue (Sunray Group, ?s, ?)

    Sold for $20.5 million, Potential redevelopment site. https://www.cbc.ca/news/canada/toronto/hotel-housing-hundreds-of-homeless-and-refugees-sold-to-developer-1.5043323
  13. yoshirocks702

    Pickering Toronto | UC1, UC2 & UC3 | ?m | 31s | Chestnut Hill | Kirkor

    Some renderings I found of Phase 1 and Phase 2 and the master plan.
  14. yoshirocks702

    Pickering Toronto | San Francisco By The Bay 3 | ?m | 25s | Chestnut Hill | Kirkor

    There's another thread for the other two buildings in this development https://urbantoronto.ca/forum/threads/toronto-san-francisco-by-the-bay-2-m-16s-chestnut-hill-kirkor-architects.656/page-2 I can say that SF3 is topped out and cladding is about 3/4 of the way to the top. Prob by summer it'll...
  15. yoshirocks702

    Finch West Line 6 LRT

    I hope your right this area could use a boost. The two BIA's (Duke Heights and Emery Village) on the corridor should have their streetscape designs that "exceed current city standards" so I hope they don't cheap out on it. It'll be interesting to see each neighbourhood have it's own identity...
  16. yoshirocks702

    Toronto Casa Emery Village | 165.09m | 55s | Medallion | Arcadis

    Quick update (no pics), drove by and shoring rig and excavator is now on site so looks like some movement on Phase 2 is imminent.
  17. yoshirocks702

    Toronto Casa Emery Village | 165.09m | 55s | Medallion | Arcadis

    I found the Primo building on realtor and Arlyn Fortin shows some pictures of the amenity spaces, a 3 bedroom unit on floor 26 looks pretty good. On another note it looks like they are pushing some dirt around but I haven't seen any significant construction progress on phase 2. They are still...

Back
Top