News   GLOBAL  |  Apr 02, 2020
 9.6K     0 
News   GLOBAL  |  Apr 01, 2020
 41K     0 
News   GLOBAL  |  Apr 01, 2020
 5.4K     0 

  1. yoshirocks702

    Finch West Line 6 LRT

    No it was mainly about the 400 bridge, they had some stuff about how the lane closures will work, otherwise I don't think I saw anything new.
  2. yoshirocks702

    Toronto The Step Condos | ?m | 5s | Terranata | Jonathan Weizel DEAD

    This development is no longer listed on the City's Development Website, although the developer's Website is still up. It should've started long ago I think they had all the approvals and it was "sold out". Anecdotally I heard there was finance issues with this project so I *think* this project...
  3. yoshirocks702

    Finch West Line 6 LRT

    Sorry you are correct, yes they will be building them on the loops and then use the SPMTs as you mentioned.
  4. yoshirocks702

    Finch West Line 6 LRT

    I stopped by quickly and basically they are going to replicate the process they've been using in Ottawa for the 400, there will be two bridges made one for southbound and one for northbound. I have confirmed that they are not widening anything it's just a replacement. At some point there will be...
  5. yoshirocks702

    Emery Village

    The BIA recently finished the 2nd phase of streetscape improvements to Islington Ave and Satterly Rd. Looks much better, we'll see how long it lasts, nice to see that they took the billboards down too. Here's some before and after photos from streetview. Before: After Ph1: After Ph2...
  6. yoshirocks702

    The Scourge of Window Film

    How about they make a nice product display that changes regularly on part of the window wall I kinda like this when they did it at the Canadian tire at Bay and Dundas. Then people can window shop, I think its better than the crappy stock photos shoppers uses. Although they should avoid stacking...
  7. yoshirocks702

    Toronto Toronto | Parkland Eglinton | 32.92m | 9s | Shannex | IBI Group

    Heres some photos i took today, this one was ignored for a bit lol lots of progress after a year.
  8. yoshirocks702

    Toronto Toronto | Wish Condos | 63.7m | 18s | Liberty Development | Turner Fleischer

    I can stop by tomorrow or Friday, unfortunately they'd be nearly night shots due to the time I'll be going through. Thanks for taking up the slack Marcus!
  9. yoshirocks702

    Lesser recognized buildings in Toronto that you enjoy

    These were probably quite nice when they were first built, too bad they have fallen into disrepair over the years.
  10. yoshirocks702

    How safe should a home be built to be?

    IMO there's a fairly simple solution, build houses like condos, make it out of concrete including the roof. They have ICF construction already which i think would work well. https://disastersafehomes.com/index.php This site claims they've been building houses like this in Guam for years, and...
  11. yoshirocks702

    Toronto Toronto | Wish Condos | 63.7m | 18s | Liberty Development | Turner Fleischer

    I drove by here the other day, they have already demo'ed the plaza, shored and dug down completely and a tower crane is installed, no pics unfortunately since I was driving.
  12. yoshirocks702

    Toronto Toronto | East 3220 Condos | 63.4m | 18s | Quadcam | Burka

    I drove by here the other day there are shoring rigs on site now working.
  13. yoshirocks702

    Toronto Casa Emery Village | 165.09m | 55s | Medallion | Arcadis

    According to the construction management plan on the city's application site, phase 2 will begin construction Nov 1, 2018 - Dec 1, 2020
  14. yoshirocks702

    Toronto The Step Condos | ?m | 5s | Terranata | Jonathan Weizel DEAD

    Found this development on Bondfield's site it says completion "February 2019" considering the only work that has progressed since the last photo is that they completed the temporary fence by enclosing the sales center, I think that date is a tad optimistic...
  15. yoshirocks702

    Toronto Toronto | 100 Queens Quay at Sugar Wharf | 117.34m | 25s | Menkes | B+H

    An interesting article on the front page about developing in flood prone areas, since everything south of Front St. is lake infill, hopefully they take these issues into consideration when building this and other buildings in the area, also assuming the Don River mouth redirection does what it's...
  16. yoshirocks702

    Toronto's Other Skylines

    VMC's developing skyline. Panoramic shot
  17. yoshirocks702

    Finch West Line 6 LRT

    The two terminal stations at Humber College and Keele will be underground.
  18. yoshirocks702

    Finch West Line 6 LRT

    Metrolinx website now lists 2023 completion http://www.metrolinx.com/en/greaterregion/projects/finchwest-lrt.aspx *edit: looks like im late, I posted back in April 25 that the date is now 2023 lol

Back
Top