3D08ADC2-87ED-4190-9973-F2F0F5DB2525.jpeg
 
Cladding on the northside of the top floor is done. Although some work remains left to do on the south side and interiors.

Dec 12, 2020

20201212_095005.jpg
20201212_095022.jpg
20201212_095046.jpg
 

Back
Top