Not sure what they are doing on the overpass next to the site.
I believe they are lowering the fifth Avenue offramp into East Village so that it's more at grade with the building.
Looks like it will be a two-way ramp, and a lane is being removed from 3rd street (presumably as part of the CMLC 3rd street improvements):
...
This and few other small projects shown on the City's site including two-way traffic between Baines Bridge and 12th St NE Bridge, and an extra through lane on WB 6th Ave @ 11th SW:
http://www.calgary.ca/Transportation/Roads/Pages/Traffic/Traffic-improvement-projects.aspx
Looks like it will be a two-way ramp, and a lane is being removed from 3rd street (presumably as part of the CMLC 3rd street improvements):
This and few other small projects shown on the City's site including two-way traffic between Baines Bridge and 12th St NE Bridge, and an extra through lane on WB 6th Ave @ 11th SW:
http://www.calgary.ca/Transportation/Roads/Pages/Traffic/Traffic-improvement-projects.aspx
Hi Group,
On 2nd Thoughts I will admit I don't really understand just what needs to B done on the 5th Ave Side of the Road. Sorry if I Confuse the
Topic.
Tnx Group,
Operater,