MichaelS
Senior Member
6-8 months maybe?
Grade level is at 100.0 so the height only works out to 118.98, which is about right (just under 400') for a 37-floor residential towerhuh?
View attachment 579523
Also the mech penthouse is new (not in the renders)
View attachment 579524
Interiors are stripped from DPs before put out to the public.Ground floor plan is hidden behind a black box for some reason. It's all retail.
I think think there is a remediation permit you can get (usually tied to shoring and excavation), I'd be amazed if there was contamination on this site, was just an ugly office building for like 40 years.What if you own a property and you desire to remove the contaminated soil that goes down 8 feet up to the property line? Shouldn't you be able to get a shoring and excavation permit?
It was a data centre for one of the big banks where all the paper cheques were clearedI think think there is a remediation permit you can get (usually tied to shoring and excavation), I'd be amazed if there was contamination on this site, was just an ugly office building for like 40 years.