General Rating for this project

  • 1 Great

    Votes: 129 86.6%
  • 2 Very Good

    Votes: 11 7.4%
  • 3 Good

    Votes: 3 2.0%
  • 4 So So

    Votes: 4 2.7%
  • 5 Not Very Good

    Votes: 0 0.0%
  • 6 Terrible

    Votes: 2 1.3%

  • Total voters
    149
Don't worry, it won't be long until Hines and One Tower are rising which should tide us over until 11th/11th and Curtis Block.

mixed feelings. even these last few floors will change the overall impact quite a bit but after this get used to alot of west village tower 1 updates. not much else even out of the ground right now.
 
hopefully this wont be the contruction update of the future

1544820227797.jpeg
 
mixed feelings. even these last few floors will change the overall impact quite a bit but after this get used to alot of west village tower 1 updates. not much else even out of the ground right now.

500 Block will be rising above grade around the time Telus Sky is fully wrapped in cladding. One Tower has already risen above grade as well. Then we'll have Curtis Block, 11 and 11, and Redstone to look forward to.
 
Wow at this rate she'll be bundled up by the end of January.
 

Back
Top