Is anything getting built where they recently demolished the Varsity Courts just north of 18/19
It looks like the plan is to do utilities, surface works, and grading in 2024 to open up blocks 11A/B, 16A/B, 17A/B for development. I assume we might see something being built there in 2025 and beyond. Beyond that the focus seems to shift to the South Lands as the next big phase of development. Varsity Courts aren't going to be fully demolished until 2026, so it'll be a while before the rest of those blocks get built out. Hard to say when Blocks 18 and 19 will be developed, but it would be nice to see the Main Street extended another few blocks!
 
I’m just amazed at how fast UD is going. Not a single slow down or break since it popped off. Just fantastic.
 

Back
Top