Sept 15
These will be used in making the guide form for the secant wall.
Nov 16
Guide completed and used -
2/23
Secant Wall for the win - very deep pit.
Note how the ramps on this one respect the lines of the podium next door.
4/9
Readying the secant wall for the second floor (bottom already poured).
4/20
Readying the secant wall for the next floor.
Holes for the rebar that will tie the floor into the secant wall.
Elevator cores taking shape.
Sept 20
Looking S down State
Stairway past heaven
Dec 21
Ride by shots from the Brown line
Feb 25
Getting lost in the crowd.
March 16 - From State and the river