Jan 27

25073687527_1b48a21f10_h.jpg


39047072525_96c2a3f77d_c.jpg
 
Climbing gallery for finishing the core and installing windows.

Feb 20

39524255195_69248826ac_h.jpg


40376023042_14bba39716_h.jpg


The bottom 3 or 4 brackets were left in place, looks like the next ones are anchored from the top as the gallery climbs.
40376021172_9033665831_b.jpg
26549063408_d353782dea_b.jpg



38609329110_f8ab139400_h.jpg
 
Feb 17

40420393301_4853396d21_h.jpg


38609696720_f45d12d9a7_h.jpg


Feb 20

40376444272_f0484e993d_h.jpg


40420390611_e0a5b13685_b.jpg


Expanding the deck/plaza - this is on the South side, at the same level as upper Wacker on the North.
39524634705_64bc02550e_h.jpg


Ground level (the overexposed brightness in the back is the river walk)
39524633035_c6cba8236c_h.jpg


Looking up
40420390021_78f3cf34ac_h.jpg
 
April 6

back in the '70s LSD flowed freely here
40408591395_d1dc0ef477_h.jpg


40408595235_b8fdc6d95d_h.jpg


Note the beams to carry the horizontal lines on - even where there is no floor plate.
26432379077_ec1251b398_h.jpg


Caulking and insulating the edges of the floor plate - the origin of the horizontal lines
40590904054_10daa1b6bf_h.jpg


Continuing the lines again - when there is no floorplate - looks like these guys have an easier time of it than the crew that is doing the edges.
41261724332_11d4a93c01_h.jpg


Glass - a piece
40590909724_5d4a4a777a_h.jpg


Union Made
41304389091_4a3463e99d_h.jpg


26432376377_6fe2e3d6ae_h.jpg



(* Lake Shore Drive )
 

Back
Top