Maybe delivering these transformers tonight/ tomorrow?
Picture from July 27 near the former tent city
4CEF59A4-D06A-4AC2-BDFB-FF87AAAFB6CD.jpeg
 

mburrrrr

Senior Member
Member Bio
Joined
Feb 10, 2010
Messages
1,151
Reaction score
15,456
Too late for #2 and too early for #3 transformer. Oh well. You get the picture. They were lifting big heavy equipment into a small hole with very little clearance.
Here is a bunch of crane or city view shots from yesterday morning. Such a beautiful morning.

It sure looks like they are holding the roof up.
EFB5C628-B5F8-4C64-AFC8-F154A3E481BB.jpeg


7803952D-68E6-4D0E-B04F-C8CBE6354DE8.jpeg


55F212F9-49FA-4A26-B0B7-8E862C93D9C0.jpeg




D937BD6F-11E7-44ED-B39C-2ABC64BA2A67.jpeg


3D58B8F0-B81F-4D73-9C02-C8FD32D682E0.jpeg


25CE9C10-EB85-46C0-881B-52FD845B6BA7.jpeg


063C8FC0-BA54-42C3-A8EA-DEE37C9D6DE9.jpeg


I walked to the airport/silos and back, an hour later - same position.
1BF9D9B8-6E2B-4B91-961E-214071498482.jpeg
 

UtakataNoAnnex

Senior Member
Member Bio
Joined
Mar 5, 2020
Messages
4,591
Reaction score
6,526
Whatever those are...they certainly look phat.

(...and not knowing what they are, from their bulbous shape are they supposed to contain/maintain some sort of liquid coolant or ionized gas or something?)
 

mburrrrr

Senior Member
Member Bio
Joined
Feb 10, 2010
Messages
1,151
Reaction score
15,456
Toshiba's Gas Insulated Transformer (GIT) is the most technologically advanced solution for hydro-power and underground substations, densely populated cities, mission critical substations, and offshore substations. Toshiba GITs are insulated with SF 6 gas rather than traditionally hazardous oil which risks fire, explosions, and contaminating leaks.

Additional advantages include reduced footprint and minimal long-term maintenance requirements. Toshiba has installed a base of more than 1400 units since delivering the first GIT in 1967. Voltage ratings are available up to 500 kV and 400 MVA.

Safety Features:
  • Non-flammable
  • Non-explosive
  • No Oil to Check or Replace
  • No Oil Leakage
Just don’t let the gas leak out.

See phase one post installation video.
44:15 previous delivery - very cool
Edit: same video posted two years ago just one page back. @AlvinofDiaspar


155 ton transformer. 18” to spare in the opening.
They installed 2 in phase one, 2 more in this phase two with a third for back up.
 
Last edited:

UtakataNoAnnex

Senior Member
Member Bio
Joined
Mar 5, 2020
Messages
4,591
Reaction score
6,526
It's almost like when the Soviets built that secret base under that shopping mall in Stranger Things, goodness...
 