How long would such a commute take, when all is said, done and completed?

With RER? Gets tricky to calculate because you would probably need to change trains and we really don't know how well Metrolinx will be able to align the schedules of the 2 overlapping services.

Without RER it would be about 80 minutes between stations (assumes new stations/track is added but electrification doesn't happen; highly likely IMO under Brown).
 
Last edited:
From Saturday.

IMG_6223.JPG
IMG_6219.JPG
IMG_6220.JPG
IMG_6222.JPG
 

Attachments

  • IMG_6219.JPG
    IMG_6219.JPG
    263.9 KB · Views: 2,059
  • IMG_6223.JPG
    IMG_6223.JPG
    592.1 KB · Views: 2,085
  • IMG_6220.JPG
    IMG_6220.JPG
    396.9 KB · Views: 2,114
  • IMG_6222.JPG
    IMG_6222.JPG
    620.7 KB · Views: 2,078
yes, it's being tendered as a part of the RER package for the Barrie Line.

There are GO Station upgrades at Kennedy and a new GO/UPX station on the Kitchener Line (Mount Dennis) that are included in the contract from my understanding however.
 
Nov 28
More up on the other 2 stations in the area up on my site
49207571983_d28427981a_b.jpg

49208054996_1309a63fc6_b.jpg

49208054821_589590aed1_b.jpg
 
March 12
Metrolinx Right Hand has no clue what the Left Hand is doing that there isn't nor will be a knockout panel from the station to the Barrie Line GO Station. Riders will have to use the walkway bridge to get access to either station. There will be a knockout panel to a condo when the plaza is redevelop that will include a tunnel and entrance that will be pay for by the developer based on Metrolinx design.

Very hard station to shoot, but will become more easy as it near the surface
49654867007_78b4f41ff1_b.jpg

49654047468_366703c4c2_b.jpg

49654866652_0948bf405d_b.jpg

49654589536_8aa580bae9_b.jpg

49654589421_0261cca951_b.jpg

49654866192_5836752b81_b.jpg

49654865997_e8b129bcc1_b.jpg

49654588931_d4296f2116_b.jpg

49654588811_2c2c046ef8_b.jpg
 

Back
Top