TAS
Senior Member
Based on the routes, I believe the largest bulk of these routes are shared paths, which are the most expensive type of infrastructure - even more than separated lanes. And then likely most common is separated infastructure. Also some painted lanes (fairly minimal) - likely a continuation of currently painted lanes along 96 street being extended north of 118 Ave.
Some good long routes through Bonnie Doon (89 and 79 Streets) from 76 Ave to near the river.
Some big routes along 95 Ave, 163 street, 107 and 111 avenues as well as 106 Ave through Capilano.
Not included in these plans are central routes such as 100 Ave between 109 to 116 street, which will be part of upcoming neighbourhood renewal. Happy to see the Victoria Park Road getting proper route from 116 street down the hill to river valley road shared path.
Some good long routes through Bonnie Doon (89 and 79 Streets) from 76 Ave to near the river.
Some big routes along 95 Ave, 163 street, 107 and 111 avenues as well as 106 Ave through Capilano.
Not included in these plans are central routes such as 100 Ave between 109 to 116 street, which will be part of upcoming neighbourhood renewal. Happy to see the Victoria Park Road getting proper route from 116 street down the hill to river valley road shared path.