LOL That thread scope would be “best described as “all of them”.
In the Pre-Metrolinx years, GO Transit was an emergiing agency with an eye on growth. They studied just about every rail line in the GTA with an eye to how it might be utilized in a bigger transportation network.
Those studies were done by serious professionals and made aome interesting observations, but they did not have the benefit of knowing what higher order transit might be built, or where the sprawl of the 905 was about to be built. So some have become irrelevant while other parts have indeed been implemented.
More recently, Metrolinx as a bureaucratic political growth industry of its own has p*ssed away millions on consultants studying things (sometimes over and over) to meet the whims of a long line of politicians.
So in the end, absolutely everything has had a “serious” study done. Even the GECO spur. The problem is finding all those old studies - one has to find a good pack rat, er, amateur archivist for the old stuff…. And good luck getting anything from ML. But they may have lots of stuff in their files that will turn up some day.
Without funding, it’s all fantasy, with politicians feeding the thought process..
- Paul
View attachment 529561