Pictures from Port Credit GO, where the mostly-underground LRT station is starting construction.

5C6D8050-DF95-4E71-80B8-B68D39D6EA94.jpeg
49C4943B-FE47-4161-A305-6E3683708E45.jpeg
 

drum118

Superstar
Member Bio
Joined
Apr 25, 2007
Messages
17,383
Reaction score
14,111
City:
Toronto

drum118

Superstar
Member Bio
Joined
Apr 25, 2007
Messages
17,383
Reaction score
14,111
City:
Toronto
As of today, Guild been a busy beaver the last week or so as poles going up at John St today, did Paisley this week and a few others.

Everything north of Matheson to 407 is duel lane in both direction only with work in the northbound lanes between Matheson - 401 and in the southbound lanes from 401 to Top Flight.

Brampton has no construction signal intersection.

From Top Flight to Matheson, all intersections have working construction signals including the 401 ramps, considering none there last week.

The 2 plaza intersection south of Eglinton, Sq One Dr, Rathburn/City View, The Queensway and Mineola intersections have working construction signals. Sheroboee, Paisley, King St, Dundas have construction signals, but not working as well Rathburn. Still leaves a fair number of intersection to be done yet.
 

bangkok

Active Member
Member Bio
Joined
Dec 8, 2011
Messages
978
Reaction score
2,764
As of today, Guild been a busy beaver the last week or so as poles going up at John St today, did Paisley this week and a few others.

Everything north of Matheson to 407 is duel lane in both direction only with work in the northbound lanes between Matheson - 401 and in the southbound lanes from 401 to Top Flight.

Brampton has no construction signal intersection.

From Top Flight to Matheson, all intersections have working construction signals including the 401 ramps, considering none there last week.

The 2 plaza intersection south of Eglinton, Sq One Dr, Rathburn/City View, The Queensway and Mineola intersections have working construction signals. Sheroboee, Paisley, King St, Dundas have construction signals, but not working as well Rathburn. Still leaves a fair number of intersection to be done yet.
THe traffic signals at Hurontario and Pinetree way (just south of the QEW) have been installed for months but still not active. I guess they won't be activated until Hurontario is single lane in each direction.
 

robmausser

Senior Member
Member Bio
Joined
Dec 16, 2013
Messages
3,568
Reaction score
5,210
The City of Brampton has posted the material for Public Information Centre No. 2: for Main LRT


Two options are being carried forward. One surface-tunnel, one surface-only. The two options are compared against each other. No new costing available. Timeline here:


If what was proposed already but cancelled by the previous council gets approved I will laugh and laugh and laugh.
 

duffo

Active Member
Member Bio
Joined
Sep 17, 2020
Messages
141
Reaction score
359
Looks like this line will be getting a mixed-traffic bottleneck after all..

True progressive thinking would have dedicated lanes, a cycle track, and a single one-way car lane (or *gasp* a total transit mall with no car lanes)
 