The buildings are emptied out and partially gutted, pending future demolition.
DSCN9151.JPG
DSCN9153.JPG
 

Attachments

  • DSCN9151.JPG
    DSCN9151.JPG
    1.4 MB · Views: 177
  • DSCN9153.JPG
    DSCN9153.JPG
    1.4 MB · Views: 203
The one on the corner will be removed eventually. Still awaiting the scaffolding and sidewalk shed. The sidewalk shed that is there is for the renovation of the existing hotel on the left. Interior demolition continues.
DSCN9732.JPG
DSCN9735.JPG
 

Attachments

  • DSCN9732.JPG
    DSCN9732.JPG
    1.1 MB · Views: 169
  • DSCN9735.JPG
    DSCN9735.JPG
    1.4 MB · Views: 155

Back
Top