To all of the keyboard commandos out there claiming to be 'bored' by this: if you'd actually bothered to engage and attend the meeting, you'd know that the diagrams and renders merely show all of the possible iterations for cladding the building on one structure and are therefore not intended to be taken literally. From there, HPA will to select one or two variations and apply them across the entire building.

The amount of fact-free bellyaching around here is nauseating sometimes.
 

P23

Active Member
Member Bio
Joined
Jul 7, 2013
Messages
772
Reaction score
312
To all of the keyboard commandos out there claiming to be 'bored' by this: if you'd actually bothered to engage and attend the meeting, you'd know that the diagrams and renders merely show all of the possible iterations for cladding the building on one structure and are therefore not intended to be taken literally. From there, HPA will to select one or two variations and apply them across the entire building.

The amount of fact-free bellyaching around here is nauseating sometimes.

How the hell were we to know that? And you could have volunteered the information with less snark.
 

Adjei

Senior Member
Member Bio
Joined
Apr 6, 2013
Messages
2,138
Reaction score
1,070
Westbank has numerous projects in Vancouver. Most are locally designed. I think this one will rate quite favourably as the design progresses. I suspect more are to come in Toronto too. This one is also an Allied/Westbank partnership.

I'm talking about their Vancouver House project.
 

maestro

Senior Member
Member Bio
Joined
Apr 23, 2007
Messages
7,314
Reaction score
2,460
I know you are but, it's one development out of a dozen Westbank has built in Vancouver. Their next project here could be by BIG.
 

metroTO

Active Member
Member Bio
Joined
May 21, 2011
Messages
299
Reaction score
1
This was just a preliminary design presentation and nothing has been submitted to the city yet.
This was just the start and there will be a lot of design development to come, so don't take what you have seen too literally.
 

mrxbombastic

Active Member
Member Bio
Joined
May 22, 2013
Messages
570
Reaction score
347
To all of the keyboard commandos out there claiming to be 'bored' by this: if you'd actually bothered to engage and attend the meeting, you'd know that the diagrams and renders merely show all of the possible iterations for cladding the building on one structure and are therefore not intended to be taken literally. From there, HPA will to select one or two variations and apply them across the entire building.

The amount of fact-free bellyaching around here is nauseating sometimes.

Not all of us had the time to attend the meeting so this seemed like what was being proposed. Thanks for the info and that should definitely factor into our discussion. Next time maybe try to convey the information in a less snarky tone

That said did HPA or the developers say when they have an idea of what will be decided or did they express any hinted enthusiasm to one motif or another?
 

steveve

Senior Member
Member Bio
Joined
Sep 1, 2009
Messages
6,231
Reaction score
8,678
I don't think this looks all that bad. Few balconies, what looks like sharp cladding without over-spandreling it, slender profile, and roof fins. Still better than most of what is proposed I would say.
 

stjames2queenwest

Senior Member
Member Bio
Joined
Sep 10, 2014
Messages
2,833
Reaction score
3,168
I rarely complain about stuff, and generally hate the bellyaching as well. HOWEVER in this case the only thing that would have NOT disappointed me would have been a BIG design.
In all honesty I don't mind this building at all. I do not think it is a fail. I'd be happy if it was practically anywhere else. I was just hoping that Westbank would give us BIG. Maybe one day.
 

grey

Senior Member
Member Bio
Joined
Apr 29, 2007
Messages
3,759
Reaction score
352
How the hell were we to know that? And you could have volunteered the information with less snark.
Not all of us had the time to attend the meeting so this seemed like what was being proposed. Thanks for the info and that should definitely factor into our discussion. Next time maybe try to convey the information in a less snarky tone
Just to offset this, I'll add that I appreciate the well-deserved snark and I'm so glad that post was at the top of the page for everyone to see.

Cheers!
 
Last edited:

smably

Senior Member
Member Bio
Joined
Jun 26, 2009
Messages
1,776
Reaction score
5,298
Yup, I also find the endless complaining tiresome, but in this case I think we were hoping for something exceptional and got something that's just pretty good. I don't think there's any need to apologize for being disappointed about that.
 

innsertnamehere

Superstar
Member Bio
Joined
Mar 8, 2010
Messages
17,870
Reaction score
18,436
City:
Toronto
This is HP, it will be fine. Probably not going to be one of HP's best works by the looks of it, but I am still doubtful that it is going to turn out horribly.

Just like The One, I get the feeling that most people gave themselves these huge expectations for this project, thinking that it would be some BIG masterpiece, and can be nothing but disappointed by whatever is actually proposed. When you look at this development objectively, its fine. Nothing extraordinary, but nothing particularly bad either.

In other news, we are starting to see some interesting cladding choices now that developers are only allowed to have 40% of building cladding being glass..
 

ProjectEnd

Superstar
Member Bio
Joined
May 28, 2007
Messages
13,054
Reaction score
30,805
It'll be more than 40%, that's just an 'optimal' target set out by the city. This was also discussed at the meeting.
 

innsertnamehere

Superstar
Member Bio
Joined
Mar 8, 2010
Messages
17,870
Reaction score
18,436
City:
Toronto
Apologies for the lack of knowledge, but my understanding was that the 40% number was set out in the building code? wouldn't that require it to be reached?
 

ProjectEnd

Superstar
Member Bio
Joined
May 28, 2007
Messages
13,054
Reaction score
30,805
No worries. Shared knowledge is why we're all here.

The OBC deals primarily with life-safety and accessibility guidelines. As this is more of a sustainability target, it falls outside Code purview.
 

Solaris

Senior Member
Member Bio
Joined
Jun 23, 2008
Messages
5,685
Reaction score
287
Is this article then false?

http://www.building.ca/news/web-exclusive-the-updated-ontario-building-code/1001011870/

*******************

The Updated Ontario Building Code
By: Steve Kemp, P.Eng
2012-03-29

The update to the 2006 Ontario Building Code, which went into effect in January 2012, is the most progressive code-required energy standard in North America. There are some significant changes to the code which will likely significantly reduce the number of glass-walled towers being constructed in Ontario cities—and not a moment too soon say energy and design professionals.

What’s Changed in the Code?

The updated OBC generally follows the building standard outlined in ASHRAE 90.1-2010 combined with the green building ASHRAE 189-2009 envelope requirements. In terms of building envelopes, ASHRAE 189-2009 actually encourages the design of green buildings rather than just the "bare minimum" of energy efficiency and occupant comfort.

There are two ways to meet the updated OBC: the performance path and the prescriptive path.

The performance path requires that a building be designed to achieve one of following:
•25% annual energy savings relative to the Model National Energy Code (this is essentially the prerequisite energy requirement for LEED).
•5% annual energy cost savings relative to ASHRAE 90.1-2010 (without the OBC envelope revisions)
•Lower annual energy cost relative to the OBC prescriptive code of ASHRAE 90.1-2010 with ASHRAE 189-2009 envelope revisions

This would need to be demonstrated through an energy model that indicates what building features are improvements over the reference buildings (i.e., daylighting sensors, triple glazed windows, ultra-high-efficiency heating plants).

The prescriptive path will have some "real eye openers" for many design teams:
•no more than 40% glazing
•many common wall constructions, such as z girts and spandrel panels, will have challenges meeting the required insulation values
•very high performance double glazed fenestration systems, and sometimes even triple glazed windows are required
•heat recovery ventilation (whereby exhaust heat is used to preheat incoming fresh air) required in more building types
 