• Thread starter Suicidal Gingerbread Man
  • Start date
Taken 30 June.

IMG_4517.jpeg

IMG_4518.jpeg
 
Wednesday night and Thursday morning.

Rumor has it that the LTower windows will be cleaned next week….. and not from the BMU.
Maybe Spider-Man and Batman.
View attachment 575923

View attachment 575924

View attachment 575925

View attachment 575926

View attachment 575927

View attachment 575928

View attachment 575929

View attachment 575930
YES, the L-Tower windows are being washed. See photo of guys (and gals?) hanging in bosun's chairs at https://urbantoronto.ca/forum/threa...82m-58s-cityzen-daniel-libeskind.495/page-492
 
Today, July 5.
More progress on the cladding for the podium. The cladding has reached the second floor.

BIBI L - ALL RIGHTS RESERVED - DO NOT USE WITHOUT PERMISSION OR CREDIT - BIBI L IMG_8294.jpg


BIBI L - ALL RIGHTS RESERVED - DO NOT USE WITHOUT PERMISSION OR CREDIT - BIBI L IMG_8295.jpg


BIBI L - ALL RIGHTS RESERVED - DO NOT USE WITHOUT PERMISSION OR CREDIT - BIBI L IMG_8296.jpg


Reflection makes it look different.

BIBI L - ALL RIGHTS RESERVED - DO NOT USE WITHOUT PERMISSION OR CREDIT - BIBI L IMG_8297.jpg


BIBI L - ALL RIGHTS RESERVED - DO NOT USE WITHOUT PERMISSION OR CREDIT - BIBI L IMG_8298.jpg


BIBI L - ALL RIGHTS RESERVED - DO NOT USE WITHOUT PERMISSION OR CREDIT - BIBI L IMG_8299.jpg


When will they start construction for the bridge to Backstage? Maybe when they are finished cladding the podium? Also, are the plans to extend the path all the way to the Green P garage on The Esplanade still happening? And if that connection does happen, would that mean 25 The Esplanade is technically connected with the PATH? Since the 6th floor terrace is on top of it, and you can just take the elevator/stairs down to the garage. Although it would probably make more sense to walk through the colonnade of 25 and enter the path through backstage.

BIBI L - ALL RIGHTS RESERVED - DO NOT USE WITHOUT PERMISSION OR CREDIT - BIBI L IMG_8300.jpg


BIBI L - ALL RIGHTS RESERVED - DO NOT USE WITHOUT PERMISSION OR CREDIT - BIBI L IMG_8301.jpg


I’m assuming the smaller wide rectangular hole on each floor in the concrete core of the building is for ventilation.

BIBI L - ALL RIGHTS RESERVED - DO NOT USE WITHOUT PERMISSION OR CREDIT - BIBI L IMG_8302.jpg
 
When will they start construction for the bridge to Backstage? Maybe when they are finished cladding the podium? Also, are the plans to extend the path all the way to the Green P garage on The Esplanade still happening? And if that connection does happen, would that mean 25 The Esplanade is technically connected with the PATH? Since the 6th floor terrace is on top of it, and you can just take the elevator/stairs down to the garage. Although it would probably make more sense to walk through the colonnade of 25 and enter the path through backstage.
This has been discussed at length WAAAAY back in this thread. The bridge to/from Backstage will be installed once they complete thee section of CIBC it comes from. At the moment the PATH will NOT be extended through the Green P though that is clearly the eventual idea. Most condo buildings do NOT want a direct PATH connection as they then have another entrance with security issues but ...
 
This has been discussed at length WAAAAY back in this thread. The bridge to/from Backstage will be installed once they complete thee section of CIBC it comes from. At the moment the PATH will NOT be extended through the Green P though that is clearly the eventual idea. Most condo buildings do NOT want a direct PATH connection as they then have another entrance with security issues but ...
Yeah, I think I read about that WAAAAY back but on the Backstage thread.
Most condo buildings do NOT want a direct PATH connection
bbbut backstage, harbour plaza, maple leaf square???
Also, 25 won’t be directly connected, but might be in a way that you won’t have to leave the building to enter the path.

Anyways, thanks, that clears some things up.
 

Back
Top