JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser .
Thread starter
Suicidal Gingerbread Man
Start date
Sep 15, 2006
September 1, 2024:
I had yet to shoot this angle from Yonge Street between the rail corridor and the Gardiner Expressway:
From the northwest corner of Bloor and Bedford this morning; I took this photo from a specific angle so that the steel structure is now visible:
My Photos on Flickr
@smuncky
"The best car-related innovation we have is not to improve the car, but eliminate the need to drive it everywhere we go.†-Alex Steffen
Here are a couple pairs of photos documenting the site on September 3, 2023, compared to today from the same angles:
An additional photo from the south today:
When I searched the photo I posted to this thread Monday on Google Lens, virtually all of the results were for its watermark.
Anyways, here is a photo I took back on September 11, 2022, from one of the angles at which I usually take photos of CIBC SQUARE from:
If you want to make an animation or GIF with my construction photos, feel free to do so.
From Exhibition Go Station (September 2, 2024)
Pictures from today and yesterday.
More east side forms coming down.
More steel ready to go up.
Ground floor - large glass window wall can’t be too far behind now.
Top anchor points visible.
RBC gold glass reflection
Probably not too much shading on the south side Esplanade patios. Maybe time for a first hand (taste) test. 2pm. 3pm. 4pm. 5pm. Left hand and then right hand.
One photo today from Duncan Street and King Street during TIFF: