lead82

Senior Member
Member Bio
Joined
Sep 18, 2007
Messages
1,427
Reaction score
655
Is the Princess of Wales theatre also being demolished or is that not part of the development?
 

neuhaus

Senior Member
Member Bio
Joined
May 18, 2010
Messages
1,559
Reaction score
1,002
If I may ask, what's so terrible about the space? Doesn't seem bad from the outside.
The space is not terrible. I have been in the space a while ago and it’s actually a cool space but it’s very specific and narrow which limits the kind of commercial space that could properly function here. It looks like the space was designed to be a restaurant but King Street commands very high rent and very few restaurant operators are willing to commit to such an undertaking. I believe in the beginning a Morimoto restaurant was anticipated here but the deal fell through.
The recessed plaza could be a really nice patio area for the restaurant if that is allowed, and a nice compliment to Forma’s base when that is completed (but that could be 8 years).
 

UtakataNoAnnex

Senior Member
Member Bio
Joined
Mar 5, 2020
Messages
5,105
Reaction score
7,421
...it will be integrated into the podium business to my understanding, with hopefully all the loving care that was afforded to Massey Hall of recent.
 

lead82

Senior Member
Member Bio
Joined
Sep 18, 2007
Messages
1,427
Reaction score
655
Oh nice!
 

ChesterCopperpot

Senior Member
Member Bio
Joined
Jul 4, 2012
Messages
4,151
Reaction score
7,067
7B3C1C52-6579-45C5-8B67-AD4D0DC7E619.jpeg
 

Koops65

Senior Member
Member Bio
Joined
Jan 31, 2018
Messages
2,016
Reaction score
6,621

interchange42

Administrator
Staff member
Member Bio
Joined
Apr 23, 2007
Messages
26,759
Reaction score
33,827
City:
Toronto
The market may be going downwards right now but what will it be in 4 years when this is built?
The first tower went on sale when the market was already sputtering, and it sold well. Gehry brings more than the usual amount of market attraction with him, it seems.
If I may ask, what's so terrible about the space? Doesn't seem bad from the outside.
IIRC it's laid out in a way that makes a restaurant difficult to operate efficiently, not enough space on the ground floor to fit a full kitchen unless all the food gets run up to the mezzanine level, and same issue with up there, you'd have run half the food downstairs if the kitchen went up there. Whatever it was, at the rents they were planning to charge, no one was able to make it work. With a wine club going in, I assume they've given up on high rents there, and the club will likely get by with far smaller kitchen spaces.

42
 

ProjectEnd

Superstar
Member Bio
Joined
May 28, 2007
Messages
13,395
Reaction score
32,918
The first tower went on sale when the market was already sputtering, and it sold well. Gehry brings more than the usual amount of market attraction with him, it seems.

IIRC it's laid out in a way that makes a restaurant difficult to operate efficiently, not enough space on the ground floor to fit a full kitchen unless all the food gets run up to the mezzanine level, and same issue with up there, you'd have run half the food downstairs if the kitchen went up there. Whatever it was, at the rents they were planning to charge, no one was able to make it work. With a wine club going in, I assume they've given up on high rents there, and the club will likely get by with far smaller kitchen spaces.

42
You got most of it, interchange. Another big issue was the physical disconnect between the loading bay and the space itself. The extremely tight site meant that while they are technically corridor-connected, all loading needs to go through the garbage area and up a set of stairs to get into the unit itself. Likewise, all garbage needs to go down those stairs to the bin storage area. Not ideal from a restaurant operations perspective, especially if your kitchen is up on the second floor which would involve the construction of a LULA lift / hydraulic elevator, potentially at the tenants' expense.

End of the day, no one was interested in taking on all that extra scope for a space of limited size, hence it's sat vacant for close to 10 years now.
 

Top