Yeah, I'd love to see Dominion return to the site. I'm sick of Metro already
Edited for content - ST
If OMB approved Tridel Hullmark Centre as is, why would there even by a community information meeting? OMB gets final say regardless of city of Toronto and local community concerns. Tridel Hullmark Centre would just proceed with their construction plans.
Community information meeting is part of the application process and is required from the city of Toronto whenever a project goes against the city rules for the area (ie zoning changes). But if a project complies with all city of Toronto rules,... no community meeting is required.
Why even have another Tridel Hullmark Centre community information meeting? Obviously, it's not to discuss the exact same thing that was discussed previously,... like proposing 164m tower in area with 100m limit and proposing residential condo towers in area designated for 0% residential (Area A). Tridel Hullmark Centre must have significant changes to their project to discuss with the community. Since Tridel Hullmark Centre is hoping to break ground this fall, they're probably be discussing a much shorter Tridel Hullmark Centre along with concessions and amenities for the community (hey, that's the way the game is played).
The fact that there will be another Tridel Hullmark Centre community information meeting means that they're still in violation of city rules for the site. My guess, it's the Area A (0% residential) that's still being violated and they've knocked down the both towers to less than 100m.
Seriously, did anyone really expect the Tridel Hullmark Centre to be built at 164m when the area height limit is 100m? Even the other condo residents are complaining! BTW, with the north-east wye directly under the both towers of Tridel Hullmark Centre and originally engineered with 100m buildings in mind, it would have been prohibitively expensive to re-engineer it for 164m towers.
Directly east of Tridel Hullmark Centre is Minto Garden's Radiance with 33 floors,... at 98m,... originally Area A 0% residential but was OMB for residential use.
http://www.urbandb.com/canada/ontario/toronto/minto_gardens_east/
Empress Walk is close to 100m limit,... with 32-33 floors building itself is about 100m,... but both towers have large artistic pinnacles on top bringing total height to 116m-118m. Empress Walk developer had to give the city and community many concessions to build residential on a site zoned for offices, originally Area A 0% residential.
Gee,... I wonder what concession Bazis Emerald Park and Tridel Hullmark Centre can offer the community.
Why can't Bazis Emerald Park and Tridel Hullmark Centre be built within the 100m limit for the area? I think the Bazis Emerald Park design is much better overall than Tridel Hullmark Centre,... but I do perfer how Tridel Hullmark Centre's interface with the street level,... the Yonge Dundas square look will bring some excitment to the area. But both residential towers of Tridel Hullmark Centre is way to plain,... seems the designers never put much effort and creativity into the design of the residential towers,... most likely because they know it'll never be built at 164m anyways.
How can Doris be extended? There are two office buildings standing in the way. And shifting Doris to the east to connect with Bonnington wouldn't work either because the CSC building is there.
it appears you like the public space proposed by Hullmark Centre, but not the tower above it ... do you expect anyone to just 'pay for' the development of public spaces and not 'make profit' from the associated project? basically you are asking developers to build the portion the community likes (plaza), and don't build portions the community dislikes (towers) ... I suppose who cares about the developer's profits ... frankly I don't think that is how business works
think about it ... if you were the developer, would you hire + pay architects to design something that you know would never get built ?
I was told that the Ring road would be completed but I don't see how that will be. Is Anndale Drive part of that ring road?
What has Tridel Hullmark Centre offered to the city so far? The southern strip of their site for an extension of Anndale Drive to meet Yonge,... for part of the eastern side of the North York downtown service road?
There are good developers and there are bad developers,...
There are good developers and there are bad developers,...
Buddy If this ressission lasts for a couple of years you will find the city will be offering perks to the developers instead of the other way around, in these rough times you should be happy and jumping for joy that a bunch of legitimate developers want to build in that area.