March 30
An letter is going out to all the buyers with an update as the towers are behind schedule.

From the shots today, M1 is working on level 57 with M 2 on 53.

The top elevator for M2 is at level 47 with M1 at 50
51970953332_0e904f804e_b.jpg

51972245029_996d83022a_b.jpg

51972025303_a8b17e9895_b.jpg

51970953122_3806f40e88_b.jpg

51972244854_588e668931_b.jpg
 
The current Exchange Towers being built maybe taller than these 2, but will become the 2nd tallest if the 72s is being built now. Unless one of the 2 Exchange towers being built is taller than 62s, M1 & 2 will be the tallest until M3 pass them.

M1 is now the tallest and will be join by M2 in May as being the tallest towers in Mississauga. Both towers will drop in ranking over the next 5 years to about 5 place

M3 will become the tallest in Mississauga come October 2023 at this time and will remain so until someone decides to build something taller in the future.

M4 is currently to be the 3rd tallest at this time when built.
 