DonValleyRainbow
Senior Member
And I noticed something else - the proposed distance from end of Osgoode to the end of Yonge is 266 metres, which would beat the current record of 300 betbetwen Osgoode and St. Andrew.
Definitely my only gripe with the new alignment. Apparently there are restrictions that forced them together like this, but I would like to see a Queen-Yonge station between Yonge and Victoria. Give some more spacing between stations, but also reach east since there will only be a Sherbourne station.
A few comments on this:
2) The direct connection to the Cherry ROW is a big deal. In the previous iterations, I was strongly suggesting an extension of the ROW, either surface or tunnelled, to connect to the DRL station around Queen & Parliament. Now that it's even south of King & Parliament, that "gap" no longer exists. This will take a huge load off the QQE ROW, as Portlands and Distillery-bound traffic will be split between QQE and Cherry.
I was harping on this too. The 514 (or any successor route that reach south into the Portlands), 504 and 501 will have a direct connection to the subway, and the benefit of that is underrated. I look forward to seeing details about how they will tie in.