maestro

Senior Member
Member Bio
Joined
Apr 23, 2007
Messages
7,323
Reaction score
2,485
If it takes five day for all parties to have a say than it's good five days have been scheduled. I'm not too keen on you implication that this should be rushed being of lesser importance than a nuclear power project.
 

interchange42

Administrator
Staff member
Member Bio
Joined
Apr 23, 2007
Messages
26,743
Reaction score
33,777
City:
Toronto
That's a pretty typical length for an OMB hearing. I took part in a two-week long hearing a few years ago.

42
 

ottbike

Active Member
Member Bio
Joined
Nov 25, 2015
Messages
359
Reaction score
337
City:
Toronto
E-Decision is now posted on the OMB website. The City has effectively accepted a settlement offer made by Sentinel. Currently, the City and Sentinel are in the process of working out the finer details of the development proposal and the final form of the ZBA/Site Plan. The details of the settlement have now been made public from the Jan 31 2017 meeting of City Council.

"City Council instruct the City Solicitor and any other appropriate City staff to attend the Ontario Municipal Board Hearing for 215-229 Church Street in support of such appeal as revised in accordance with the settlement offer from the proponent's solicitor David Bronskill, dated September 8, 2016, attached as Confidential Appendix A to the report (January 31, 2017) from the City Solicitor, including revised plans satisfactory to the Chief Planner...and as further revised as follows: to limit the height of such building to a maximum of 52 storeys together with the related reduction in metres, to increase the Section 37 contribution to $3.1 Million Dollars to be used for capital improvements ... and to resolve the deployment and design of balconies through the submission of the balcony design to the Design Review Committee at the site plan approval stage."

Full details of the settlement offer can be found by using the Appendix A link.
 

interchange42

Administrator
Staff member
Member Bio
Joined
Apr 23, 2007
Messages
26,743
Reaction score
33,777
City:
Toronto
Thanks for catching that @ottbike.

So, here's a bit of a summary:
  • Originally submitted at 46 storeys, 159.6 m/523.5 ft
  • Appealed to the OMB based on the City's lack of a decision within the statutory period
  • City and Pemberton continue to talk in advance of the OMB hearing
  • Pemberton ups the ask based on recent approvals at Dundas and Jarvis to 53 storeys and 167.9 m/550.7 ft
  • as per the note above, the City settles with Pemberton at 52 storeys (and therefore approximately 165 m/541 ft)
That height is not final, but it could be used until such time as we get the Site Plan Application documents.

So, @DonValleyRainbow, update for the 120 metre list?

42
 

interchange42

Administrator
Staff member
Member Bio
Joined
Apr 23, 2007
Messages
26,743
Reaction score
33,777
City:
Toronto
Yup, first time I've run into that too, but nearby approvals were going that much higher, so they went for it!

42
 

torplanner

Active Member
Member Bio
Joined
Mar 11, 2009
Messages
288
Reaction score
278
Which ones were going higher? The Jarvis-Church stretch are all sub-50 I thought?

I wonder if they got the floorplates under 750 as a compromise at least.
 

DonValleyRainbow

Senior Member
Member Bio
Joined
Mar 5, 2014
Messages
2,867
Reaction score
1,924
City:
Toronto
Thanks for catching that @ottbike.

So, here's a bit of a summary:
  • Originally submitted at 46 storeys, 159.6 m/523.5 ft
  • Appealed to the OMB based on the City's lack of a decision with the statutory period
  • City and Pemberton continue to talk in advance of the OMB hearing
  • Pemberton ups the ask based on recent approvals at Dundas and Jarvis to 53 storeys and 167.9 m/550.7 ft
  • as per the note above, the City settles with Pemberton at 52 storeys (and therefore approximately 165 m/541 ft)
That height is not final, but it could be used until such time as we get the Site Plan Application documents.

So, @DonValleyRainbow, update for the 120 metre list?

42

@interchange42 Maybe, at least once it gets a database file I can link to ;)
 

PMT

Senior Member
Member Bio
Joined
Jul 14, 2016
Messages
3,925
Reaction score
8,410
City:
Toronto
Rendering from the Dev App site:
upload_2017-5-1_19-45-31.png
 

Attachments

  • upload_2017-5-1_19-45-31.png
    upload_2017-5-1_19-45-31.png
    323.6 KB · Views: 588

Top