xmyth_
Senior Member
Wasn’t sure what this was, or which side it belonged to. But it was on the north side of the channel. Anyone have a clue?
It is 'concrete equipment' https://maxon.com/equipment/agitor/ but why it is on this barge I do not know. Being moved to one of the concrete plants??Wasn’t sure what this was, or which side it belonged to. But it was on the north side of the channel. Anyone have a clue?
View attachment 666237
@GameOnBrad was up to his usual eagle-eyed observations on his daily rounds......
He spotted this:
View attachment 685377
The application number is new, the application is not currently public facing in the AIC.
25 175195 STE 10 OZ is live in the AIC, and has been since June when we covered The Bend on the front page.
![]()
Application Details
www.toronto.ca
Eventually the Lake Shore Blvd and Gardiner sections along the canal will be rebuilt closer to the rail yard which will clear up space.That’s not a lot of space for that cluster of buildings east of Cherry.
Isn’t the Gardiner realignment needed before that though? I feel like it be lost the thread on where that is. I know some plan at some point had buildings on the north side of Keating Channel.Eventually the Lake Shore Blvd and Gardiner sections along the canal will be rebuilt closer to the rail yard which will clear up space.