Still no landscaping here. As Concert does not start occupancies until the building totally done and ready to be registered, there's no reason to rush that here I suppose. Maybe trees will be planted in the fall?

DSC08604.jpg
DSC08605.jpg
DSC08606.jpg
DSC08611.jpg


42
 

Attachments

  • DSC08604.jpg
    DSC08604.jpg
    636.7 KB · Views: 2,058
  • DSC08605.jpg
    DSC08605.jpg
    403.5 KB · Views: 2,065
  • DSC08606.jpg
    DSC08606.jpg
    308.1 KB · Views: 2,093
  • DSC08611.jpg
    DSC08611.jpg
    665.8 KB · Views: 2,028
As Concert does not start occupancies until the building totally done and ready to be registered, there's no reason to rush that here I suppose. Maybe trees will be planted in the fall?

42

Aside from The Berczy, has Concert done this for any other development in Toronto? 88 Scott started occupancy late October 2017 and isn't registered. Amenities only opened a few months ago and some are still not ready.

The Kip turned out great and I'm looking forward to seeing future phases.
 
Last edited:
I suppose the other Concert properties in Etobicoke so far have been rentals, and the only other Toronto condos they've built so far have been the Sherwood and Blythwood at Huntington, both with Tridel up on Bayview. I believe their "don't occupy until it's ready to register" policy was in place there. 88 Scott would be the first time they have not done that then. It is, by quite a bit the largest building they've ever built, and I assume that's why they were not able to not able to follow through in that regard. Hmm. I wonder if they'll return to that policy for other Ontario projects, or if it's toast…

42
 
Looks like some landscaping is going in - I was able to walk around to the south side and snap a photo of the facade too. There is a sign by the Dundas entry that reads "Concert Pedestrian Entrance"... not sure if I interpreted this a little too liberally but I just walked in, there were no gates or construction signage up...

IMG_20180729_152232.jpg
IMG_20180729_152323.jpg
IMG_20180728_110750.jpg
IMG_20180729_152116.jpg
 

Attachments

  • IMG_20180729_152232.jpg
    IMG_20180729_152232.jpg
    242.7 KB · Views: 2,037
  • IMG_20180729_152323.jpg
    IMG_20180729_152323.jpg
    236.7 KB · Views: 2,048
  • IMG_20180728_110750.jpg
    IMG_20180728_110750.jpg
    316.4 KB · Views: 2,020
  • IMG_20180729_152116.jpg
    IMG_20180729_152116.jpg
    190 KB · Views: 2,318
Last edited by a moderator:
Aug 01,
Rogers is in the process of moving their trunk line 2' to the north so shoring can start on the next tower. Site in the process of being clean up.
 
Aug 25
Shoring equipment on site as well some other equipment. Looks like they will be shoring along Dundas to the east property line and then south along it.
 

Back
Top