Rascacielo
Senior Member
Is the ballroom open?Sept 12th, latest set of hangers being installed to the floor of level 59
View attachment 595829View attachment 595830View attachment 595831View attachment 595832
Is the ballroom open?Sept 12th, latest set of hangers being installed to the floor of level 59
View attachment 595829View attachment 595830View attachment 595831View attachment 595832
The Ballroom Bowl opened back in March of this year.Is the ballroom open?
Apologies if this was previously posted, this is a busy thread so I might have missed it.......
But there was a move to amend the building permit here in August:
View attachment 595986
@Paclo I think this settles the height question given the timing.
Thanks. It mentions there are 4 levels of commercial parking? What about residential parking?Apologies if this was previously posted, this is a busy thread so I might have missed it.......
But there was a move to amend the building permit here in August:
View attachment 595986
@Paclo I think this settles the height question given the timing.
Apologies if this was previously posted, this is a busy thread so I might have missed it.......
But there was a move to amend the building permit here in August:
View attachment 595986
@Paclo I think this settles the height question given the timing.
Hey @Northern Light can you give the link to the new submission? I can't seem to find it.
Apologies if this was previously posted, this is a busy thread so I might have missed it.......
But there was a move to amend the building permit here in August:
View attachment 595986
@Paclo I think this settles the height question given the timing.
Hmm, the submission:
View attachment 487193
*****
Ahhh, here was the interesting bit.................I was looking for:
View attachment 487196
The above was part of the Councillor's motion, which can be read in full, here:
That's right, everyone's invited inside 'The One'.......to enjoy art; AND, the view.
I think we (well, most of us) knew this............but the receiver here has now given clear indication that they are still very much in building mode.... (into the future)....
Strategy Corp is now working on their behalf (lobbying) for expeditious permits:
View attachment 523590
I'd be guessing, but...... the current 'New Building' permits still show the height as 86 storeys. I would guess that revisions have been or about to be applied for, and that those are pending.
There may also be revisions for other spaces (such as ground floor retail tenant).
Nice!Photos taken today, Friday (Sept. 13). The forms at top have moved up a level, I think we are at level 70 at the core. At 69 for sure. As documented by BloorMan above, the latest set of hangers were installed yesterday linking the corner floors of level 59 to the top of level 64. These are the 10th set of hangers, the first set of three for the third mega-section, as I call the sections between the mechanical floors. One section below, the west Rail Climbing System has joined the east and north ones, installing the skin on level 39, the first floor of the second mega-section. How come I never realized until now that there are exactly 20 floors between each mega-section? Meanwhile, at ground level nothing new to report as we wonder if a retail tenant will move in there soon.
Starting with the latest "time-lapse" Flickr album update (I also now include the view from Cumberland by Bay in that album to better see the top of the tower rising), to the view from Yonge and Dundas to the south, a closer view from Yonge and Alexander showing the top half of the tower and tighter shot from below, then to shots looking straight up with the crane prominent. The view from across in front of Holt Renfrew on Bloor to the west, and from Balmuto across the street, views from Cumberland east of Bay, then from Bloor east of Yonge by the old Bay main entrance. And a final set from Bloor west at Bedford, 1 Bloor E now no longer visible behind 1 Bloor W. The view from Devonshire, south of Bloor, and from College and Queen's Park Crescent.