Today. Last update for the next six weeks.
6064F234-30C7-4CC8-AB6A-E7760C939354.jpeg
9EA8FB34-3323-4A41-9AE6-86FD4586FBF2.jpeg
40DC0A46-DF70-4A51-B6CD-D6DD55766537.jpeg
F85B043E-6C87-4C59-AF8C-1A35F4B8F590.jpeg
97D0A95A-51CF-45FC-B87F-4052EF88888A.jpeg
C92EDE08-08C5-45EB-AAE6-4195C913BD74.jpeg
2C7997FA-5372-4686-B0DE-D344D705FED0.jpeg
507B2D5A-F6A5-4E71-B1C5-D9B33284EA3B.jpeg
B9DC42F5-1295-4233-BD38-0EE903B0046C.jpeg
6B4E6815-AEEF-492B-9EC3-761C6551E3E7.jpeg
 
@Benito returns ~ December 21st; everyone put it on your calendar! :D

His return is UT's Christmas present!

***

In all seriousness @Benito enjoy some much deserved downtime (I'm assuming/hoping that's what the break is)
 
Last edited:
Can anyone assess how fast this project is moving upwards now?
1 floor every 2-3 weeks?

They were doing 1 regular hotel floor every ~1.5 calendar weeks. It looks like mechanical floors will take ~ 4 weeks. Considering the inevitable winter slowdown due to weather I would venture to say that by this time next year they will be working on the 40-50 floors.
 
6 weeks!? Goodness, we'll be suffering from the shakes by then... >.<

His return is UT's Christmas present!
I think his contributions here has always been a Christmas present! <3

Enjoy the well deserved time off, Mr. Benito. /bows
 
You guys will probably enjoy what we have been able to do with the recent drone video that was posted a couple pages back, speeding it up and providing a detailed description of what you're seeing as the drone drops down in the ACS. Read about it on the front page here.

42
 

Back
Top