They are currently starting the final mechanical "inset" section, spanning floors 78 and 79. Although these mechanical sections take a little longer than residential levels to pour, after that, there are 6 more residential levels to pour before reaching the top of the 85-storey plan:When will we know what the final height for this will be? I would think that has to be finalized very soon for engineering/constructions reasons?
If I had to guess, it would be around February 2025 when we reach the 85th floor, at which point we shall see if they pour the additional floors. Anyways, here is a photo of the One I took this morning:Here is the detail from the architectural plans.
308m tall version is kinda sad coz the 300m mark is only achieved within the Tuned Mass Damper room. The roof of the highest habitable floor is 292m with the winter garden taking it up to 295m but the winter garden is more like a terrace for the penthouse suites:
View attachment 611134
For the taller version I only have the tallest 338m architectural plans saved. But for the 328m it will be the same floor where the building passes the 300m mark. Level 88 is where the building crosses the 300m mark with Level 88 roof being at 302.75m high:
View attachment 611135
The 328m tall version will simply be cut at Level 91 with the TMD right above it. Apologies for not showing the actual 328m tall version of the building.
What's this thing calledMaybe this thing will be One North....
View attachment 611249
I believe that skyscraper plan near Yonge and Finch was only a concept or vision, rather than a serious proposal.What's this thing called
ThrowbackJust came across this awesome photo realistic rendering in an ad in Toronto Life.
View attachment 207228