j_yyz

New Member
Member Bio
Joined
Apr 22, 2021
Messages
25
Reaction score
300
It’s finally showing up on my view south of Bloor

23FB9CF8-C123-40FE-A036-AED8DA7DFFA1.jpeg
 

madknife

Active Member
Member Bio
Joined
Nov 24, 2016
Messages
195
Reaction score
253
Some new docs have been added to the Toronto Development Application database on Aug. 8, 2022.
Cover Letter: https://secure.toronto.ca/9b55477f-6d1b-4600-bb03-887e3ab99c0c
Architectural Plan: https://secure.toronto.ca/ed7ed84e-a3bd-428e-904c-c4839e4d4fd8
Servicing Report: https://secure.toronto.ca/f57901cd-a1e7-4ca5-8b8e-2e13350d2fc2

Interestingly enough, the current plan still shows the newly added Level 79-87 as Low Rise units... with High Rise units only covering Level 62-76... which doesn't make any sense at all... but I'm assuming it's a trivial matter for them to flip the LR and HR floors after approval...
 

3Dementia

Senior Member
Member Bio
Joined
Apr 24, 2007
Messages
3,414
Reaction score
4,655
Some new docs have been added to the Toronto Development Application database on Aug. 8, 2022.
Cover Letter: https://secure.toronto.ca/9b55477f-6d1b-4600-bb03-887e3ab99c0c
Architectural Plan: https://secure.toronto.ca/ed7ed84e-a3bd-428e-904c-c4839e4d4fd8
Servicing Report: https://secure.toronto.ca/f57901cd-a1e7-4ca5-8b8e-2e13350d2fc2

Interestingly enough, the current plan still shows the newly added Level 79-87 as Low Rise units... with High Rise units only covering Level 62-76... which doesn't make any sense at all... but I'm assuming it's a trivial matter for them to flip the LR and HR floors after approval...
The links are "blocked" ... any advice?
 

3Dementia

Senior Member
Member Bio
Joined
Apr 24, 2007
Messages
3,414
Reaction score
4,655
I recall reading the lighting plan (nice!) before, but a recap💡:
a) Linear up lights on the louvres/mechanical sections.
b) linear down lights on the columns.
c) inward facing LEDs lighting the Tuned Mass Damper cladding at the top.

The-One-lighting.jpg


Toronto Development Application database
 

jibsta

Active Member
Member Bio
Joined
Nov 6, 2019
Messages
199
Reaction score
334
Some new docs have been added to the Toronto Development Application database on Aug. 8, 2022.
Cover Letter: https://secure.toronto.ca/9b55477f-6d1b-4600-bb03-887e3ab99c0c
Architectural Plan: https://secure.toronto.ca/ed7ed84e-a3bd-428e-904c-c4839e4d4fd8
Servicing Report: https://secure.toronto.ca/f57901cd-a1e7-4ca5-8b8e-2e13350d2fc2

Interestingly enough, the current plan still shows the newly added Level 79-87 as Low Rise units... with High Rise units only covering Level 62-76... which doesn't make any sense at all... but I'm assuming it's a trivial matter for them to flip the LR and HR floors after approval...
The builder told me higher floors would simply end up with a higher floor number if approved, so im guessing these will be slid in lower.

As expected, the form work is making quick work. The whole core rebar is in and i bet we will be pouring walls within 2 days.

It looks like the elevator roof is done as well

Working on some buyers for the site the last few weeks, I was told 50 - 60 floor range would be occupied by fall 2024.

This would be a 7 year total time from sales in fall 2017.. which is not that bad considering forma is saying 2028 but lowkey telling me 2029 - 2030.... for a super tall complex site they are actually on par with a great gulf... Seems construction is on pace. What was wrong was their ambitious completion estimate from the start.
 
Last edited:

Top